Laserfiche WebLink
Environmental Protection Agency §112,7 <br /> subject to this part; or, if your facility explain separately the details of instal- <br /> was in operation on or before August lation and operational start-up. As de- <br /> 16, 2002, five years from the date your tailed elsewhere in this section, you <br /> last review was required under this must also: <br /> part. As a result of this review and (a)(1) Include a discussion of your fa- <br /> evaluation, you must amend your cility's conformance with the require- <br /> SPCC Plan within six months of the re- ments listed in this part. <br /> view to include more effective preven- <br /> tion and control technology if the tech- (2) Comply with all applicable <br /> nology has been field-proven at the quirements listed in this part. Your <br /> time of the review and will signifi- Plan may deviate from the require- <br /> cantly reduce the likelihood of a dis- and (I in paragraphs (g), (h)(2) and (3), <br /> charge as described in §112.1(b) from mentand (i) of this section and the require- <br /> the facility. You must implement any except <br /> in subparts B and C of this part, <br /> amendment as soon as possible, but not except the secondary containment re- <br /> later than six months following prepa- Sof irements this parag ahs sect ( ) and (hand <br /> ration of any amendment. You must <br /> document your completion of the re- §§112.8(c)(2),112.8(c)(11), 112.9(c)(2), <br /> view and evaluation, and must sign a 112.10(c), 112.12(c)(2), <br /> statement as to whether you will 112.12(c)(11),112.13(c)(2), and 112.14(c), <br /> amend the Plan, either at the begin- Where applicable to a specific facility, <br /> ning or end of the Plan or in a log or an if you provide equivalent environ- <br /> appendix to the Plan. The following mental protection by some other <br /> words will suffice, "I have completed means of spill prevention, control, or <br /> review and evaluation of the SPCC countermeasure. Where your Plan does <br /> Plan for (name of facility) on (date), not conform to the applicable require- <br /> and will (will not) amend the Plan as a ments in paragraphs (g), (h)(2) and (3), <br /> result." and (i) of this section, or the require- <br /> (c) Have a Professional Engineer cer- ments of subparts B and C of this part, <br /> tify any technical amendment to your except the secondary containment re- <br /> Plan in accordance with§112.3(d). quirements in paragraphs (c) and (h)(1) <br /> of this section, and §§112.8(c)(2), <br /> §112.6 [Reserved] 112.8(c)(11), 112.9(c)(2), 112.10(c), <br /> 112.12(c)(2), 112.12(c)(11), 112.13(c)(2), and <br /> Pr <br /> §11 General requirements for Spill 112.14(c),you must state the reasons for <br /> Prevention, Control, and Counter- nonconformance in our Plan and de- <br /> measure Plans. Y <br /> If you are the owner or operator of a scribe in detail alternate methods and <br /> facility subject to this part you must ronmenhow you will achieve equivalent conal <br /> prepare a Plan in accordance with good Administrator <br /> protection. If the Regional <br /> engineering practices. The Plan must Administrator determines that the <br /> measures described in your Plan l not <br /> have the full approval of management <br /> at a level of authority to commit the tectiprovide equivalent environmental pro- <br /> necessary resources to fully implement men n, he may require that you <br /> a <br /> the Plan. You must prepare the Plan in amend your Plan, following the proce- <br /> writing. If you do not follow the se- dures in§112.4(d) and (e). <br /> quence specified in this section for the (3) Describe in your Plan the physical <br /> Plan, you must prepare an equivalent layout of the facility and include a fa- <br /> Plan acceptable to the Regional Ad- cility diagram, which must mark the <br /> ministrator that meets all of the appli- location and contents of each con- <br /> cable requirements listed in this part, tainer. The facility diagram must in- <br /> and you must supplement it with a sec- clude completely buried tanks that are <br /> tion cross-referencing the location of otherwise exempted from the require- <br /> requirements listed in this part and the ments of this part under §112.1(d)(4). <br /> equivalent requirements in the other The facility diagram must also include <br /> prevention plan. If the Plan calls for all transfer stations and connecting <br /> additional facilities or procedures, pipes. You must also address in your <br /> methods, or equipment not yet fully Plan: <br /> operational, you must discuss these (i) The type of oil in each container <br /> Items in separate paragraphs, and must and its storage capacity; <br /> 29 <br />