Environmental Protection Agency §112,7
<br /> subject to this part; or, if your facility explain separately the details of instal-
<br /> was in operation on or before August lation and operational start-up. As de-
<br /> 16, 2002, five years from the date your tailed elsewhere in this section, you
<br /> last review was required under this must also:
<br /> part. As a result of this review and (a)(1) Include a discussion of your fa-
<br /> evaluation, you must amend your cility's conformance with the require-
<br /> SPCC Plan within six months of the re- ments listed in this part.
<br /> view to include more effective preven-
<br /> tion and control technology if the tech- (2) Comply with all applicable
<br /> nology has been field-proven at the quirements listed in this part. Your
<br /> time of the review and will signifi- Plan may deviate from the require-
<br /> cantly reduce the likelihood of a dis- and (I in paragraphs (g), (h)(2) and (3),
<br /> charge as described in §112.1(b) from mentand (i) of this section and the require-
<br /> the facility. You must implement any except
<br /> in subparts B and C of this part,
<br /> amendment as soon as possible, but not except the secondary containment re-
<br /> later than six months following prepa- Sof irements this parag ahs sect ( ) and (hand
<br /> ration of any amendment. You must
<br /> document your completion of the re- §§112.8(c)(2),112.8(c)(11), 112.9(c)(2),
<br /> view and evaluation, and must sign a 112.10(c), 112.12(c)(2),
<br /> statement as to whether you will 112.12(c)(11),112.13(c)(2), and 112.14(c),
<br /> amend the Plan, either at the begin- Where applicable to a specific facility,
<br /> ning or end of the Plan or in a log or an if you provide equivalent environ-
<br /> appendix to the Plan. The following mental protection by some other
<br /> words will suffice, "I have completed means of spill prevention, control, or
<br /> review and evaluation of the SPCC countermeasure. Where your Plan does
<br /> Plan for (name of facility) on (date), not conform to the applicable require-
<br /> and will (will not) amend the Plan as a ments in paragraphs (g), (h)(2) and (3),
<br /> result." and (i) of this section, or the require-
<br /> (c) Have a Professional Engineer cer- ments of subparts B and C of this part,
<br /> tify any technical amendment to your except the secondary containment re-
<br /> Plan in accordance with§112.3(d). quirements in paragraphs (c) and (h)(1)
<br /> of this section, and §§112.8(c)(2),
<br /> §112.6 [Reserved] 112.8(c)(11), 112.9(c)(2), 112.10(c),
<br /> 112.12(c)(2), 112.12(c)(11), 112.13(c)(2), and
<br /> Pr
<br /> §11 General requirements for Spill 112.14(c),you must state the reasons for
<br /> Prevention, Control, and Counter- nonconformance in our Plan and de-
<br /> measure Plans. Y
<br /> If you are the owner or operator of a scribe in detail alternate methods and
<br /> facility subject to this part you must ronmenhow you will achieve equivalent conal
<br /> prepare a Plan in accordance with good Administrator
<br /> protection. If the Regional
<br /> engineering practices. The Plan must Administrator determines that the
<br /> measures described in your Plan l not
<br /> have the full approval of management
<br /> at a level of authority to commit the tectiprovide equivalent environmental pro-
<br /> necessary resources to fully implement men n, he may require that you
<br /> a
<br /> the Plan. You must prepare the Plan in amend your Plan, following the proce-
<br /> writing. If you do not follow the se- dures in§112.4(d) and (e).
<br /> quence specified in this section for the (3) Describe in your Plan the physical
<br /> Plan, you must prepare an equivalent layout of the facility and include a fa-
<br /> Plan acceptable to the Regional Ad- cility diagram, which must mark the
<br /> ministrator that meets all of the appli- location and contents of each con-
<br /> cable requirements listed in this part, tainer. The facility diagram must in-
<br /> and you must supplement it with a sec- clude completely buried tanks that are
<br /> tion cross-referencing the location of otherwise exempted from the require-
<br /> requirements listed in this part and the ments of this part under §112.1(d)(4).
<br /> equivalent requirements in the other The facility diagram must also include
<br /> prevention plan. If the Plan calls for all transfer stations and connecting
<br /> additional facilities or procedures, pipes. You must also address in your
<br /> methods, or equipment not yet fully Plan:
<br /> operational, you must discuss these (i) The type of oil in each container
<br /> Items in separate paragraphs, and must and its storage capacity;
<br /> 29
<br />
|