My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO PLAZA
>
3400
>
2200 - Hazardous Waste Program
>
PR0514278
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 12:39:53 PM
Creation date
10/31/2018 9:41:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514278
PE
2228
FACILITY_ID
FA0010308
FACILITY_NAME
TRACY CHEVROLET
STREET_NUMBER
3400
STREET_NAME
AUTO PLAZA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
21227011
CURRENT_STATUS
01
SITE_LOCATION
3400 AUTO PLAZA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\A\AUTO PLAZA\3400\PR0514278\COMPLIANCE INFO 2001- 2017.PDF
QuestysFileName
COMPLIANCE INFO 2001- 2017
QuestysRecordDate
7/19/2018 3:46:14 PM
QuestysRecordID
3944121
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c f <br /> I(*PA <br /> RECEIVED <br /> MAY 0 4 20% <br /> Tracy Chevrolet ENVIRONMENTALSER CESTM <br /> ALTH <br /> Mr. Ryan Ford <br /> 3400 Auto Plaza Way <br /> Tracy, CA 95304 <br /> Enclosed for your review, please find your Professional Engineer (PE) certified Spill Prevention, Control <br /> and Countermeasure(SPCC)Plan. A copy of this plan must be maintained on site at all times and be made <br /> available for inspection by regulators during business hours. To complete the plan, your designated Plan <br /> Manager must sign and complete part A.9 (Management Approval). Please also ensure attachment (D) is <br /> signed; the Certification of the Applicability of the Substantial Harm Criteria. <br /> A few additional points: first, this is a facility document that specifies activities it will undertake to <br /> implement the Plan. Since the facility alone is responsible, KPA strongly encourages that, prior to <br /> management approval, the Plan be carefully reviewed and any issues or questions resolved. In that regard, <br /> if the facility wishes to make any changes to this Plan,please contact your KPA EHS consultant within two <br /> weeks. Presuming any changes are made, a Professional Engineer will need to review again, and recertify <br /> the Plan. <br /> Once the facility approves the final Plan, it must ensure appropriate staff are aware of its provisions and <br /> adhere to them. This plan requires certain activities to be carried out, such as ongoing tank system <br /> inspections, record keeping of inspections, and employee training. In addition to these routine activities, <br /> the Plan is required to be periodically reviewed as specified in part A. Remember to maintain onsite access <br /> of this plan and all recordkeeping required under this plan. This would include all tank system inspections, <br /> employee training rosters, and periodic plan reviews. <br /> If you have any questions, please contact your KPA Risk Management Consultant or call our support line <br /> at 1 (800)486-0400. <br /> Sincerely, <br /> Jean Lewis <br /> SPCC Coordinator <br /> (866) 356-1735 <br />
The URL can be used to link to this page
Your browser does not support the video tag.