My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO PLAZA
>
3400
>
2200 - Hazardous Waste Program
>
PR0514278
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 12:39:53 PM
Creation date
10/31/2018 9:41:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514278
PE
2228
FACILITY_ID
FA0010308
FACILITY_NAME
TRACY CHEVROLET
STREET_NUMBER
3400
STREET_NAME
AUTO PLAZA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
21227011
CURRENT_STATUS
01
SITE_LOCATION
3400 AUTO PLAZA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\A\AUTO PLAZA\3400\PR0514278\COMPLIANCE INFO 2001- 2017.PDF
QuestysFileName
COMPLIANCE INFO 2001- 2017
QuestysRecordDate
7/19/2018 3:46:14 PM
QuestysRecordID
3944121
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION, CONTROL, & COUNTERMEASURE.(SPCC) PLAN <br /> Tracy Chevrolet <br /> PART A: GENERAL INFORMATION <br /> t. Name of Facility: Tracy Chevrolet <br /> 2. Type of Facility: Automobile Dealership <br /> 3. Initial Date of Facility Operation: 2003 <br /> 4. Location of Facility: 3400 Auto Plaza Way <br /> Tracy, CA 95304 <br /> 5. Name& Address of Owner/Operator: Tracy Chevrolet <br /> iv1r. iviike Qvale <br /> 3400 Auto Plaza Way <br /> Tracy ,CA 95304 <br /> 6. Responsible Person for Plan Management: Service Manager <br /> 7. Spill/Release Response Plait: See Attachment(C) <br /> S. Periodic Review <br /> This SPCC Plan has been prepared to conform to the requirements of Federal regulation,40 CFR 112. To ensure <br /> it remains current, it will be reviewed and evaluated at least once every five years. Within six months of the <br /> review, it will be amended to include more effective prevention and control technology if the technology is field <br /> proven and will significantly reduce the likelihood of an oil spill event. This plan will also be amended within <br /> six months whenever there is a change in facility design, construction, operation, or maintenance that materially <br /> affects the facility's potential for the discharge ofoil.All amendments will be certified by a Professional Engineer <br /> in accordance with 40 CFR, Part i I2.3(d). <br /> 9. Management Approval <br /> The Responsible Person for this Pot shall�ntent this SPCC Plan as herein described. <br /> Signature: �� � Title: ?/�� <br /> Name: 4hWDate: 117, AW/ <br /> 10. Certification <br /> I hereby certify that i have,or my agent has,visited the facility and that i have examined this plan.Being familiar <br /> with the provisions of 40 CFR, Part 112, 1 attest that it has been prepared in accordance with good engineering <br /> practices, including applicable industry standards and procedures for inspectio t ul testing. I consider the plan <br /> adequate for the facility. <br /> OQ��F r 9!F ignature o Registered Professions Engineer <br /> c� M- 4 9 r Printed Name Date <br /> Exp. <br /> v Tracy Chevrolet SPCC flan <br /> * HAN �P 08-14 <br /> ��OF CAS-�F�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.