Laserfiche WebLink
PART B: SPILL PREVENTION, C TROL, &COUNTERMEASURES <br /> 1. Responsible Person <br /> The dealership's Service Manager is the Responsible Person for this plan. The designated Responsible Person is <br /> responsible for oil spill prevention,control, and countermeasure activities. <br /> 2. Potential Spills of Oil—Prediction and Control <br /> Note: A facility map illustrating the location of each listed tank/container is included as Attachment (A). <br /> Source Probable Type Maximum <br /> No. Description of Failure Quantity(gallons) Flow Rate Probable Direction of I-Inw Secondary Containment <br /> (Gals/hour) <br /> Above ground gasoline Small leak or I Iorizontal square <br /> steel tank located Immediate a s e ank <br /> I North into the storm drain outside north of the complete 1,000 gallons total release out of service) <br /> service department. rupture <br /> Above ground waste oil Small leak or Horizontal rectangle Immediate <br /> 2 steel tank located in the complete 480 gallons total release North onto oil room floor Double wall steel tank <br /> oil room. rupture <br /> Above ground new oil Small leak or <br /> 3 steel tank located in the complete Horizontal rectangle Immediate <br /> p 500 gallons total release North onto oil room floor Double wall steel tank <br /> oil room. rupture <br /> Above ground ATF Small leak or Horizontal rectangle Immediate <br /> 4 steel tank located in the complete North onto oil room floor Double wall steel tank <br /> oil room. rupture 240 gallons total release <br /> Above ground new oil Small leak or Horizontal rectangle Immediate <br /> 5 steel tank located in complete 185 gallons total release West onto quick lube floor Double wall steel tank <br /> quick lube. rupture <br /> Maximum of two waste <br /> fuel steel drums Small leak or Immediate Steel Drum set within a <br /> 6 located in the complete 55 gallons each Southwest onto shop floor <br /> Nouthwest area of rupture. total release containment pallet <br /> service shop. <br /> Maximum of two new Small leak or <br /> 7 oil steel drums complete 55 gallons each Immediate Northeast onto quicklube floor Steel drum set within a <br /> located in the quick rupture. total release containment pallet <br /> lube <br /> Maximum of two new Small leak or Immediate Steel drum set within a <br /> 8 oil steel drums located complete 55 gallons each Norteast onto quick lube floor <br /> in quick lube rupture. total release containment pallet <br /> Tracy Chevrolet SPCC Plan <br /> 08-14 <br />