Laserfiche WebLink
Gold Bond Building Products -6- 20 November 1985 <br /> • <br /> 9. Submit a time• schedule for all work elements. Progress reports must be <br /> submitted quarterly. <br /> • INSPECTION SUMMARY <br /> Gold Bond is in violation of Board Order No. 79-186, Effluent Limitation B. 1, <br /> Provision A.1; and threatened violation of Receiving Water Limitations 0.2, D.3 <br /> hnd D.6: <br /> • A.1 The discharge of wastes other than noncontact process cooling waters <br /> to surface waters or surface water drainage courses is prohibited. <br /> 8.1 The discharge shall consist of only cooling water. <br /> 0.2 The discharge shall not cause visible oil , grease, scum, foam, or <br /> • floating or suspended material in the receiving waters or <br /> watercourses. <br /> 0.3 The discharge shall not cause concentrations of any materials in the <br /> receiving waters which are deleterious to human, animal , aquatic or <br /> plant life. <br /> • <br /> 0.6 The discharge shall not cause bottom deposits in the receiving <br /> waters which are deleterious to human, aquatic or plant life. " <br /> RICHARD G. AZEVEDO,Area Engineer <br /> • RGA:jec <br /> cc: Mr. Michael Rogge, Gold Bond, Stockton <br /> Department of Industrial Relations, OSH, Standards Board, Sacramento <br /> • <br />• <br />• <br />