My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2200 - Hazardous Waste Program
>
PR0220074
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:43:29 AM
Creation date
10/31/2018 12:27:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0220074
PE
2220
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
01
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHURCH\800\PR0220074\COMPLIANCE INFO 2017-PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2017-PRESENT
QuestysRecordDate
5/4/2017 6:33:34 PM
QuestysRecordID
3259761
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
----- <br /> SPILL PROCEDURES <br /> Notify Emergency Coodinator of spill and await instructions. <br /> Refer to MSDS for proper handling safety precautions and PPE before handling any <br /> chemical. <br /> If a chemical ever brewbcs company Property andlor reactionary methods: <br /> Y Request assistance from appropriate agencies <br /> A Initiate clean up and disposal <br /> L Prepare a spill repots <br /> Canbftiltg Hazardous Material Spill—Outside Buildiog <br /> t Dike stoma drains <br /> ➢ If spilled material has migrated to slough,or into storm drain,request assistance <br /> i Notify appropriate agencies <br /> D Initiate clean up and disposal <br /> Prepare a spill report <br /> Compressed Gas Leak <br /> Should a gas leak occur from the liquefied petroleum Sas tanks outside,first of all,stay <br /> away from tanks and prevent ignition Contact fire department immediately. <br /> DOCUMENTATION AND PLAN EVALUATION <br /> Following the complete remediation of an incident a written chronology of the incident <br /> shall be included at the back of this plan.Additional reports shall be prepared and issued <br /> as required or requested by regulatory agencies.A formal evaluation of the spill plan <br /> shall be conducted after each incident by the Emergency Coordinator to determine the <br /> cause of the incident,the applicability of the plan as implemented, and to allow for <br /> development and impieotctdation of improved measures and plan revisions. <br /> The spill plan will be modified if then:changes in the facility design,construction,or <br /> operation that may increase the risk of spills or unplanned releases.or if there is a change <br /> of coordinators. <br /> A copy of the plan and all revisions shall be maintained in the facility at all times. <br /> TRAINING <br /> All personnel will be trained on an annual basis on the following: <br /> 1. proper handling of hazardous materials used , , <br /> 2. Spill Plan responsibilities and implementation ' <br /> 3. Evacuation procedums <br />
The URL can be used to link to this page
Your browser does not support the video tag.