My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLARK
>
3927
>
2200 - Hazardous Waste Program
>
PR0514138
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 4:22:31 PM
Creation date
10/31/2018 12:27:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514138
PE
2230
FACILITY_ID
FA0010034
FACILITY_NAME
PNP Stockton #80
STREET_NUMBER
3927
Direction
E
STREET_NAME
CLARK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17917109
CURRENT_STATUS
01
SITE_LOCATION
3927 E CLARK DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CLARK\3927\PR0514138\COMPLIANCE INFO 1991 - 2011.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2011
QuestysRecordDate
11/14/2017 5:47:21 PM
QuestysRecordID
3727153
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br /> Summary of CCR Requirements <br /> Pick-N-Pull <br /> Stockton,California <br /> Code Section Requirement comments <br /> 66265.192(a) Owners or operators of new tank systems or components shall ensure that the <br /> foundation,structural support,seams,connections,and pressure controls(if <br /> applicable)are adequately designed and that the tank System has sufficient structural Used Oil/Waste Antifreeze-HDPE secondary containment on concrete slab,tank flush mounted on grade.Used Oil <br /> strength,compatibility with the waste(s)to be transferred,stored or treated,and (Customer Drop off)-HDPE double walled. <br /> corrosion protection so that it will not collapse,rupture,or fail. <br /> 66265.192(a)(3)(B) the type and degree of external corrosion protection that are needed to ensure the <br /> integrity of the tank system during the use of the tank system or component, <br /> consisting of one or more of the following: <br /> 1.corrosion-resistant materials of construction such as special alloys or fiberglass- used Oil/Waste Antifreeze-XLPE container,no corrosive protection for XLPE. <br /> reinforcedplastic; <br /> 2.corrosion-resistant coating(such as epoxy or fiberglass)with cathodic protection <br /> e.g.,impressed current or sacrificial anodes);and NA <br /> 3.electrical isolation devices such as insulating joints and flanges; NA <br /> 66265.192(a)(5)(A) Design considerations to ensure that Tank systems will be anchored to prevent Installation of tank clips and/or seismic cables is recommended for the tank system and Customer Drop-off tnak to prevent <br /> dislodgement where tank system is located in a seismic fault zone. movement during seismic events. Seismic desgin calcultions should be performed to determine appropriate clip size and <br /> attachment method(eg.g.bolting,welding,etc.).Care should be taken(e.g.epoxy coating over bolts,etc)to protect the <br /> integrity of the containment if penetrations are made. <br /> 66265.192(e) Ancillary equipment shall be supported and protected against physical damage and <br /> excessive stress due to settlement,vibration,expansion or contraction. Oil crusher&Sump tank"Bread box"stands bolted to concrete slab <br /> 66265.192(f) The owner or operator shall provide the type and degree of corrosion protection <br /> necessary,based on the information provided under subsection(a)(3)of this section, <br /> to ensure the integrity of the tank system during use of the tank system.The <br /> installation of a corrosion protection system that is field fabricated shall be supervised NA <br /> by an independent corrosion expert to ensure proper installation. <br /> 66265.1920)(1) tank system must have secondary containment capable of containing 100 percent of <br /> the contents of the tank and ancillary piping volume;and Compliant <br /> 66265.1920)(2) If the tank system is exposed to precipitation,the secondary containment system <br /> must have sufficient capacity,in addition to that required in subsection 0)(1)of this <br /> Under roof/canopy of Drain Building. <br /> section,to contain run-on and infiltration from a 25-year,24-hour rainfall event. <br /> 66265.192 0)(3) The tank system secondary containment shall be provided with a leak detection <br /> system that is designed and operated so that it will detect either the failure of the <br /> primary and secondary containment structure or any release of hazardous waste or <br /> accumulated liquid in the secondary containment system within 24 hours,or at the Visual inspections are conducted daily to check for leaks and or spills. <br /> earliest practicable time if the existing detection technology or site conditions will not <br /> allow detection of a release within 24 hours. <br /> 66265.192(k)(1) Tank configuration,material of construction and gross capacity. See Table 1 <br /> 66265.192(k)(2) Design standards,if available according to which the tank and ancillary equipment <br /> were constructed and all of the following information. <br /> 66265.192 k 2 A material of construction Used Oil&Waste Antifreeze-XLPE <br /> 66265.192 k 2 B material thickness and the method used to determine the thickness See manufacturers specifications <br /> 66265.192 k 2 C description of tanks stem piping Steel/Flex/PVC/Rubber <br /> 66265.192 k 2 D descriptio of any internal and external pumps;and Double diaphragm pumps(external) <br /> 66265.192 k 2 E sketch or drawing of the tank including dimensions. See Figure 3 and Appendix C,as applicable <br /> 66265.192(k)(3) Documented age of the tank system <br /> Use Oil and Waste Antifreeze(1995).Used Oil (Customer drop off)-(Unknown). <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.