Laserfiche WebLink
Table 4 <br /> Summary of CCR Requirements <br /> Pick-N-Pull <br /> Stockton,California <br /> Code Section Requirement Comments <br /> 66265.193(e)(2)(B) Vaults must be designed or operated to prevent run—on and infiltration of <br /> precipitation into the secondary containment unless the collection system has <br /> sufficient excess capacity,in addition to that required in Subsection(e)(1)(A)of this NA <br /> section,to contain run-on and infiltration of precipitation from a 25 year,24 hour <br /> rainfall event. <br /> 66265.193(e)(2)(C) Vaults must be constructed with chemical resistant water stops in place at all joints NA <br /> 66265.193(e)(2)(D) Vaults must be provided with an impermeable interior coating or lining that is <br /> compatible with the waste being transferred,stored or treated and that will prevent NA <br /> migration of waste into the concrete. <br /> 66265.193(e)(2)(F) provided with an exterior moisture barrier or be otherwise designed or operated to <br /> prevent migration of moisture into the vault if the vault is subject to hydraulic NA <br /> pressure. <br /> 66265.193(e)(3)(A) Double-walled tanks shall be:designed as an integral structure(i.e.,an inner tank <br /> within an outer shell)so that any release from the inner tank is contained by the outer Compliant <br /> shell; <br /> 66265.193(e)(3)(B) Double-walled tanks shall be:protected,if constructed of metal,from both corrosion <br /> of the primary tank interior and the external surface of the outer shell;and XLPE <br /> 66265.193(e)(3)(C) Double-walled tanks shall be:provided with a built-in,continuous leak detection <br /> system capable of detecting a release within 24 hours or at the earliest practicable <br /> time,if the owner or operator can demonstrate to the Department,and the Daily Visual Inpsections <br /> Department concurs,that the existing leak detection technology or site conditions will <br /> not allow detection of a release within 24 hours. <br /> 66265.193(f) Ancillary equipment shall be provided with full secondary containment(e.g.trench, <br /> jacketing,double-walled piping)that meets the requirements of subsections(b)and Piping is above ground. <br /> (c)of this section except for: <br /> 66265.193 1 aboveground piping that are visually inspected for leaks on a daily basis Compliant <br /> 66265.193(f)(2) welded flanges,welded joints,and welded connections that are visually inspected for Compliant <br /> leaks on a daily basis <br /> 66265.193(f)(3) sealless or magnetic coupling pumps and sealless valves,that are visually inspected NA <br /> for leaks on a daily basis and <br /> 66265.193(f)(4) pressurized above ground piping with automatic shut-off devices that are visually Compliant-pumped/gravity drained <br /> inspected for leaks on a daily basis. <br /> Updated:7/18/18 <br /> Reviewed by:MMC 7/27/18 <br /> Page 3 of 3 <br />