Laserfiche WebLink
water back to cooling towers. This new water repurposing capability has resulted in <br />the reuse of approximately 400,000 gallons of water per year. <br />No other source reduction activities for this waste stream are <br />11.2 Buiidw .maltmg O erations <br />Site I 1 2014 quantity (lb) <br />SNL/CA 1 3;100 <br />at this time. <br />FIGURE III.11.2. BUILDING. 943 PLA'T'ING OPBRATIONS <br />The rinse water from the Plating Operations in Building 943 is normally treated in a closed <br />loop system that removes spent materials from process waste water. In 2014 the Plating Line <br />was remodeled in order to upgrade and modernize the operation. As a result the bath had to <br />be emptied, which resulted in the generation of 3100 lbs. of this waste stream, <br />avuxt;t; xt;liuc:ItUN/POLLUTION PREVENTION' EVALUATION <br />liescriptton of Measure• <br />The remodel of this plating line was sone -time event aiid should not have to be <br />performed again. The rinse water will continue to be treated in a closed loop system <br />that removes spent materials' from process waste water and introduced back into the <br />plating operations. No source reduction activities are planned for this waste stream. <br />September 1, 2015 SB 14 Plan IIT -33 <br />