My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br />DEC 0 4 2015 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sj <br />EKwiRONMENTAL oov.or /q ehd <br />HEALTH DEPARTIVIGNToveground <br />Petroleum Storage Act Inspection Report <br />Facility Name: <br />Lawrence Livermore National Lab - Site 300 <br />Facility Address: <br />15999 W CORRAL HOLLOW RD Trac <br />FDate: <br />September <br />30 <br />2015 <br />General Requirements for SPCC Plans <br />613 <br />CFR <br />112.7(e) <br />Failed <br />Failed <br />to conduct inspections or maintain records for 3 years <br />to train personnel on discharge prevention <br />o <br />V <br />❑ <br />R <br />o <br />COS <br />614 <br />CFR 112.7(f)(1) <br />u V ❑ R ❑ <br />COS <br />615 <br />CFR <br />112.7(0(2) <br />Failed <br />Failed <br />to designate a person accountable for discharge prevention <br />to schedule and conduct discharge prevention briefings at least annually <br />■ <br />V <br />o <br />R <br />u <br />COS <br />616 <br />CFR 112.7(f)(3) <br />o V u R o <br />COS <br />617 <br />CFR <br />112.7(8) <br />Plan failed to address security of site and valves, lock out/tag out, and lighting <br />■ <br />V <br />o <br />R <br />❑ <br />COS <br />618 <br />CFR <br />112.7(h)(1) <br />Loading/unloading rack containment system not properly sized <br />❑ <br />V <br />❑ <br />R <br />❑ <br />COS <br />619 <br />CFR <br />112.7(h)(2) <br />Failed <br />to provide vehicular departure system loading and unloading racks <br />o <br />V <br />❑ <br />R <br />u <br />COS <br />E• 620 <br />CFR <br />112.7(h)(3) <br />Failed <br />to inspect lowermost drains and outlets prior to filling and departure of vehicles <br />o <br />V <br />OR <br />o <br />COS <br />621 <br />CFR <br />112.7(1) <br />Failed <br />to evaluate field constructed container for brittle fracture and take appropriate action <br />❑ <br />V <br />❑ <br />R <br />❑ <br />COS <br />622 <br />CFR <br />112.7Q) <br />Failed <br />to include discussion of conformance to discharge prevention and containment procedures <br />a <br />V <br />u <br />R <br />o <br />COS <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br />701 <br />CFR <br />112.8(b)(2) <br />Failed <br />to use manual open-and-closed design valves for the drainage of diked areas <br />o <br />V <br />❑ <br />R <br />❑ <br />COS <br />702 <br />CFR 112.8(b)(3), <br />112.8(b)(4) <br />Failed <br />to design facility drainage system from undiked areas to retain in the facility <br />o <br />V <br />❑ <br />R <br />o <br />COS <br />703 <br />CFR <br />112.8(b)(5) <br />Failed <br />to provide two lift pumps for more than one continuous treatment unit <br />o <br />V <br />o <br />R <br />a <br />COS <br />704 <br />CFR <br />112.8(c)(2) <br />Diked <br />area Is not sufficiently impervious to contain discharged oil <br />o <br />V <br />a <br />R <br />❑ <br />COS <br />705 <br />CFR <br />112.8(c)(1) <br />Container not compatible with oil stored and/or storage conditions <br />o <br />V <br />OR <br />❑ <br />COS <br />706 <br />CFR <br />112.8(c)(2) <br />Failed <br />to provide and maintain adequate secondary containment <br />❑ <br />V <br />o <br />R <br />❑ <br />COS <br />707 <br />CFR <br />112.8(c)(3)(i) <br />Failed <br />to keep containment bypass valves closed when not draining rainwater <br />❑ <br />V <br />❑ <br />R <br />a <br />COS <br />708 <br />CFR <br />112.8(c)(3)(h) <br />Failed <br />to inspect retained rainwater prior to discharge <br />❑ <br />V <br />❑ <br />R <br />o <br />COS <br />709 <br />CFR <br />112.8(c)(3)(iii) <br />Failed <br />to open and close bypass valve to drain rainwater under responsible supervision <br />o <br />V <br />❑ <br />R <br />❑ <br />COS <br />710 <br />CFR <br />112.8(c)(3)(iv) <br />Failed <br />to maintain records of drainage from diked areas <br />o <br />V <br />❑ <br />R <br />a <br />COS <br />711 <br />CFR <br />112.8(c)(5) <br />Failed <br />to provide corrosion protection for partially buried tanks <br />o <br />V <br />❑ <br />R <br />❑ <br />COS <br />712 <br />CFR <br />112.8(c)(6) <br />Failed <br />to perform tank inspections that take into account size, configuration, and design <br />❑ <br />V <br />❑ <br />R <br />u <br />COS <br />713 <br />CFR <br />112.8(c)(6) <br />Failed <br />to perform scheduled tank tests and Inspections by appropriately qualified personnel <br />■ <br />V <br />OR <br />o <br />COS <br />714 <br />CFR <br />112.8(c)(6) <br />Failed <br />to test and inspect containers by appropriately qualified personnel after material repairs <br />❑ <br />V <br />o <br />R <br />a <br />COS <br />715 <br />CFR <br />112.8(c)(7) <br />Failed <br />to provide effective leakage control through defective internal heating coils <br />❑ <br />V <br />❑ <br />R <br />o <br />COS <br />716 <br />CFR <br />112.8(c)(8)(I-iv) <br />Failed <br />to provide each container with a high level monitoring device <br />❑ <br />V <br />❑ <br />R <br />❑ <br />COS <br />717 <br />CFR <br />112.8(c)(8)(v) <br />Failed <br />to regularly test liquid level sensing devices to ensure proper operation <br />in <br />V <br />❑ <br />R <br />❑COS <br />718 <br />CFR <br />112.8(c)(9) <br />Failed <br />to observe effluent treatment frequently enough to detect potential discharge <br />a V u R o <br />COS <br />719 <br />CFR <br />112.8(c)(10) <br />Failed <br />to promptly correct visible discharges and/or remove accumulations of oil in diked areas <br />❑ <br />V <br />a <br />R <br />o <br />COS <br />720 <br />CFR <br />112.8(c)(11) <br />Failed <br />to provide sufficient secondary containment capacity for mobile or portable containers <br />o <br />V <br />o <br />R <br />o <br />COS <br />721 <br />CFR <br />112.8(c)(11) <br />Failed <br />to locate mobile or portable containers to prevent discharge <br />❑ <br />V <br />❑ <br />R <br />u <br />COS <br />722 <br />CFR <br />112.8(d)(1) <br />Failed <br />to take corrective action on buried piping when exposed for any reason <br />o <br />V <br />o <br />R <br />❑ <br />COS <br />Received by <br />(initial):�i/e <br />Inspector: <br />STACY RIVERA, Senior REHS� <br />Phone: <br />(209) 468-3440 <br />Date: <br />09/30/2015 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.