My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br />San Joaquin County <br />DEC 0 4 2015 Environmental Health Department AMENDED <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />(209) 468-3420 Fax (209) 468-3433 Web: www.sjaov.orci/ehd <br />NVIRONMENWEPhone: <br />HEALTH DEP�g round Petroleum Storage Act Inspection Report <br />Facility Name: <br />Facility Address: <br />Date: <br />Lawrence Livermore National Lab - Site 300 <br />15999 W CORRAL HOLLOW RD Trpcy <br />September 30 2015 <br />SPCC 'Plan Requirements for Onshore Facilities (excluding production facilities) <br />723 <br />CFR 112.8(d)(1) <br />Failed to provide corrosion protection for buried piping <br />❑ V ❑ R o COS <br />724 <br />CFR 112.8(d)(2) <br />Failed to cap/blank-flange connection at transfer point and mark its origin if not in service <br />o V ❑ R ❑ COS <br />725 <br />CFR 112.8(d)(3) <br />Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction <br />❑ V ❑ R ❑ COS <br />726 <br />CFR 112,8(d)(4) <br />Failed to regularly inspect aboveground valves, piping, and appurtenances <br />o V ❑ R ❑ COS <br />727 <br />CFR 112.8(d)(4) <br />Failed to conduct integrity and leak test on buried piping any time it is worked on <br />❑ V ❑ R ❑ COS <br />728 <br />CFR 112.8(d)(5) <br />Failed to adequately warn vehicles entering facility to protect piping and other transfer operations <br />❑ V o R ❑ COS <br />Other Violations <br />4010 <br />See below <br />Unlisted Administration/Documentation violation <br />❑ V ❑ R ❑ COS <br />4020 <br />See below <br />Unlisted Training violation <br />❑ V ❑ R ❑ COS <br />Unlisted Operations/Maintenance violation <br />4030 <br />See below <br />❑ V ❑ R ❑ COS <br />4040 <br />See below <br />Unlisted Release/Leaks/Spills violation <br />❑ V ❑ R ❑ COS <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS 11, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />201 <br />CFR 112.3(d) Plan certification by a Professional Engineer (PE) missing or incomplete. <br />The Professional Engineer (PE) certification is incomplete. The facility has calculated the APSA regulated capacity <br />separately for each building at the facility. Only buildings 801 and 883 were calculated by the facility to have APSA <br />regulated capacity. A PE certified SPCC Plan was prepared for building 801. The SPCC Plan prepared for building <br />883 was a Tier I template and not PE certified, The PE certification must include all of the aspects in 40 CFR 112.3(d) <br />(1), including attesting that the PE is familiar with 40 CFR Part 112, he or his agent has visited and examined the <br />facility, the Spill Prevention, Control, and Countermeasure (SPCC) Plan has been prepared in accordance with good <br />engineering practice, including consideration of applicable industry standards, procedures have been established for <br />required inspections and testing, and the Plan is adequate for the facility. Immediately obtain a complete PE <br />certification for the facility's SPCC Plan. Submit a copy of the completed certification to the EHD. <br />This is a Class II violation. <br />604 <br />CFR 112,7(a)(3) No facility diagram or didn't show location and contents of containers, transfer stations, and pipes. <br />The facility has calculated the APSA regulated capacity separately for each building at the facility and prepared <br />separate SPCC Plans. Only buildings 801, 846, 865, and 883 have SPCC Plans (according to the inventories, <br />buildings 846 and 865 do not have APSA regulated capacity). The inventories of the additional buildings at the facility <br />were not included on the map included in the SPCC Plans, The Spill Prevention, Control, and Countermeasure <br />(SPCC) Plan shall include a facility diagram which must mark the location and contents of each fixed storage <br />container and the storage area where mobile or portable containers are located. It must identify the location of and <br />mark as "exempt" underground tanks. It must also Include all transfer stations and connecting pipes, including <br />intra-facility gathering lines. Immediately update the facility diagram to include all of the required information. Submit <br />a legible copy of the updated facility diagram to the EHD for review. <br />This is a Class II violation. <br />Received byInspector: <br />Phone. <br />Date: <br />(initial): <br />1A (,�{(Qd <br />STACY RIVERA, Senior REHS 0/%*� <br />(209) 468-3440 <br />09/30/2015 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.