Laserfiche WebLink
• <br />PROJECT COST ESTIMATE <br />Task 1- Develop Work Plan and Site Specific Health <br />and Safety Plan <br />C.K.C. (See Page 6 of Proposal at Appendix D) $ 1,060 <br />Task 2 - Construct Site Security Fencing <br />C.K.C. (See Page 6 of Proposal at Appendix D) Complete <br />Task 3 - Clean-up of Lead Searing Filter Cake Sludge <br />Spilled Outside the Facility <br />C.K.C. (See Page 6 of Proposal at Appendix D) Complete <br />Task 4 - Removal of Asphalt Impacted with Oil <br />C.K.C. (See Page 7 of Proposal at Appendix D) $ 6,000 <br />Task 5 - Relocation of 55 -gallon Capacity Poly Drums <br />Containing Chemicals <br />CKC. (See Page 7 of Proposal at Appendix D) Complete <br />Task 6 - Inventory, Identify, and Label Chemicals <br />C.K.C_ (See Page 7 of Proposal at Appendix D) Complete <br />Task 7 - Removal of Hazardous Chemicals and Contaminants <br />C.KC. (See Page 7 of Proposal at Appendix D) $ 33,035 <br />Task 8 - Removal of Piping Located in the Concrete <br />Sumps and Drainage System <br />C.KC. (See Page 8 of Proposal at Appendix D) $ 10,114 <br />Task 9 - Steam Cleaning of Concrete Sumps, Drainage <br />System, and Floor <br />C.K.C. (See Page 8 of Proposal at Appendix D) $ 17,621 <br />