Laserfiche WebLink
0 <br />r <br />Task 30 - Removal of Ceiling Piping and Ventilation Ducts <br />C.K.C. (See Page 9 of Proposal at Appendix D) <br />Task. 11- Bead Blasting of Concrete Floors <br />C.KC. (See Page 9 of Proposal at Appendix D) <br />Task 12 - Removal of Non -Hazardous Material and Debris <br />C.K.C. (See Page 10 of Proposal at Appendix D) <br />Task 13 - Disposal of Hazardous Chemicals and Contaminants <br />and Non -Hazardous Material and Debris <br />C.K.C. (See Page 10 of Proposal at Appendix D) <br />Task 14 - Inspection and Monitoring <br />Senior Engineer <br />Mileage <br />Task 15 - Sampling <br />Senior Engineer <br />Associate Scientist <br />Laboratory Analysis <br />Soil <br />Wipe <br />Equipment <br />Mileage <br />180 hours @ $85/hour <br />2250 miles @ $0.45/mile <br />Subtotal <br />50 hours @ $85/hour <br />50 hours @ $60/how <br />$ 11,794 <br />$ 13,167 <br />$ 3,218 <br />$205,859 <br />$15,300 <br />1,012 <br />$16,312 <br />$ 4,250 <br />$ 3,000 <br />30 samples @ $184/sample $ 5,503 <br />25 samples @ $162/sample $ 4,050 <br />5 days @ $170/day $ 850 <br />750 miles @ $0.45/mile 338 <br />Subtotal $17,991 <br />