My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:28:00 PM
Creation date
11/1/2018 8:32:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CHRONOLOGY <br /> JH GRIFFIN/MOBILE SERVICE <br /> 75 E. ALPINE <br /> STOCKTON CA 95204 <br /> 09/14/94 Four underground storage tanks (UST)were removed this date under <br /> permit and inspection of San Joaquin County Environmental Health <br /> Department (SJC/EHD). The owner of the property was Theresa Marler, <br /> of Marler Industries. The tank excavation pit was not filled in; temporary <br /> rented fencing was placed around it to secure the site. <br /> 10/11/94 Soil analytical results from tank pull samples indicate contamination. <br /> SJC/EHD letter sent this date notifying the responsible party that further <br /> site investigation is required. Unauthorized Release Report#94-U54 and <br /> Hazardous Waste Notification (Prop 65) #94-130 filed this date. <br /> 03/10/95 Site entered into Local Oversight Program. <br /> 06/09/95 Notice of Responsibility (NOR) and site letter sent to Marler Industries. <br /> 07/10/95 "NOR" and site letter that was sent to Marler Industries returned to <br /> SJC/EHD marked "Unclaimed". <br /> 07/20/95 "NOR" and site letter remailed this date to Marler Industries. <br /> 09/21/95 Notification received from the fencing contractor that they have not been <br /> paid and intend to remove the fence from around the excavation. <br /> Attempts to contact Theresa Marler were unsuccessful; she did not <br /> respond to any messages. <br /> 09/27/95 "NOR" and site letter mailed this date to Marler Construction. <br /> 10/16/95 SJC/EHD contacted SWRCB regarding use of"EAR" account to obtain <br /> funds for backfilling the excavation. The site is on a busy corner and the <br /> open excavation presents a safety hazard to traffic and pedestrians. <br /> 11/03/95 "EAR" account funds approved for backfill of excavation. <br /> 11/06/95 "NOR" and site letter sent to Marler Construction returned this date, <br /> marked "unclaimed". <br /> 11/13/95 Re-sampling of the tank pit took place this date. <br /> 11/17/95 Completed backfill of tank excavation using "EAR" account funds. <br /> 05/15/97 New property owner identified: Guido Segarini c/o Stockton Mortgage; <br /> property transfer not yet recorded. <br /> 10/27/99 A Work Plan to begin the site investigation was submitted to SJC/EHD on <br /> behalf of the Guido Segarini Trust. <br />
The URL can be used to link to this page
Your browser does not support the video tag.