My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2900 - Site Mitigation Program
>
PR0526874
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:28:00 PM
Creation date
11/1/2018 8:32:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526874
PE
2960
FACILITY_ID
FA0018201
FACILITY_NAME
FORMER MOBIL SERVICE STATION 99-CAS
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
01
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pile No. 20-3908-01.M01 k4 K L E I N F E L D E R <br /> December 8, 1995 <br /> Page 1 of 1 <br /> TABLE I <br /> MOISTURE DENSITY ANALYSES <br /> ASTM D-1557,METHOD "A" <br /> Maximum Optimum Curve <br /> Material , sc ptton and'Source: D ensi.ry ;Moisture Content Numlier <br /> Brown clayey silty sand with hardpan, import 120.1 pcf 12.0% 1 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry LAborasory Specked <br /> Test Finished Moiauue Density Compaction Re Wive Relative <br /> No. Date Tea Lucatioo Subgrade(ft.) % Dry Wt P.C.F. Curve No. cornpution Compaction <br /> 1 11-15 Southwest side -10.0 18.0 108 1 90 90 <br /> 2 11-15 Northwest side -9.0 17.8 109 1 91 90 <br /> 3 11-15 East side -9.0 16.5 109 1 91 90 <br /> 4 11-15 East side -8.0 13.4 109 1 91 90 <br /> 5 11-15 West side -7.0 14.1 109 1 91 90 <br /> 6 11-15 North side -6.0 16.0 110 1 91 90 <br /> 7 11-15 East side -5.0 17.4 109 1 91 90 <br /> 8 11-15 West side , -5.0 16.3 109 1 90 90 <br /> 9 11-15 North side -4.0 15.4 108 1 90 90 <br /> 10 11-15 South side -3.0 15.5 109 1 90 90 <br /> 11 11-16 Eastside -3.0 14.2 109 1 90 90 <br /> 12 11-16 West side -3.0 13.0 110 1 91 90 <br /> 13 11-16 North end -2.0 12.9 111 1 91 90 <br /> 14 11-16 East end -2.0 11.9 110 1 91 90 <br /> 15 11-16 West end -2.0 13.6 109 1 90 90 <br /> 16 11-16 East end -1.0 15.8 110 1 91 90 <br /> 17 11-16 West end -1.0 14.3 109 1 90 90 <br /> 18 11-16 East end FSG 12.3 111 1 92 90 <br /> 19 11-16 Center FSG 14.0 111 1 92 90 <br /> 20 11-16 West end FSG 12.8 111 1 92 90 <br /> Accepted engineering and bsdag procedures wen used for thew tsw. The above date is presented for bformatlon purposes only. In she absence of coodououa obwrvadl of our personnel <br /> at the site,we candor espreas an ophdon as to the adequacy of alb preparation or overall fdi compaction. We do sot undertake the guanotee of construction,nor do we relieve she conn wr <br /> of his pronary responsibility to produce a courpbted project coafo®bg to she projact plana sod speciflutb"a. Copyright 1995 Kieinfelder,Lee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.