My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2200 - Hazardous Waste Program
>
PR0538621
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:22 AM
Creation date
11/1/2018 9:44:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0538621
PE
2249
FACILITY_ID
FA0021035
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
198-180-01
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOWLAND\16777\PR0538621\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
5/2/2017 5:16:59 PM
QuestysRecordID
3372862
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' ARCADIS SOP:Soil Drilling and Sample Collection a <br /> Rev.A 1 I Rev Date: March 3,2009 <br /> Radio Frequency Detector(RFD) <br /> ' 0 Ground Penetrating Radar(GPR) <br /> • Any other method that may give ample evidence of the presence or location of <br /> ' subgrade utilities. <br /> Overhead power lines also present risks and the following safe clearance must be <br /> ' maintained from them. <br /> Power Line Voltage Minimum Safe Clearance <br /> ' Phase to Phase(kV) (feet) <br /> 50 or below 10 <br /> ' Above 50 to 200 15 <br /> Above 200 to 350 20 <br /> Above 350 to 500 25 <br /> ' Above 500 to 750 35 <br /> Above 750 to 1,000 35 <br /> ANS!standard s30.5-1994, 5-3.4.5 <br /> Avoid using drilling fluids or materials that could impact groundwater or soil quality,or <br /> ' could be incompatible with the subsurface conditions. <br /> Water used for drilling and sampling of soil or bedrock, decontamination of <br /> ' drilling/sampling equipment, or grouting boreholes upon completion will be of a quality <br /> acceptable for project objectives. Testing of water supply should be considered. <br /> ' Specifications of materials used for backfilling borehole will be obtained, reviewed and <br /> approved to meet project quality objectives. <br /> ' V. Health and Safety Considerations <br /> Field activities associated with overburden drilling and soil sampling wiil be performed <br /> in accordance with a site-specific HASP, a copy of which will be present on site during <br /> ' such activities. <br /> gboDxOr*r&afvmthd. s2=&yd,vgakVy 8"6%31510.seY driM+g sntl m1 wbodanAne <br />
The URL can be used to link to this page
Your browser does not support the video tag.