My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2200 - Hazardous Waste Program
>
PR0538621
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:22 AM
Creation date
11/1/2018 9:44:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0538621
PE
2249
FACILITY_ID
FA0021035
FACILITY_NAME
OCCIDENTAL CHEMICAL CORP
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
198-180-01
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOWLAND\16777\PR0538621\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
5/2/2017 5:16:59 PM
QuestysRecordID
3372862
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADISSOP:Hydropunch®Groundwater Sampling Procedures 4 <br /> Rev.#:01 Rev Date:March 24,2004 <br /> 1 <br /> • Field logbook. <br /> Note:The polyethylene tubing should fit tightly inside of the silicon tubing.Therefore, <br /> the outer diameter of the polyethylene tubing should be approximately equal to the <br /> inner diameter of the silicon tubing.The silicon tubing should be the appropriate size ' <br /> for the pump head on the peristaltic pump. <br /> IV. Cautions ' <br /> Sampling must be discontinued during heavy rain if there is a potential that rain water <br /> could contaminate grab groundwater samples. ' <br /> Indelible ink pens must be used to complete sample labels. <br /> Samples containers should be packed on ice and stored in a cool,shaded place to ' <br /> maintain a sample temperature of approximately 40C. Ice must be double bagged to <br /> prevent leakage. Sample containers should be stored inside sealable plastic bags to ' <br /> prevent cross contamination should a container break during transit. Packing tape with <br /> volatile adhesives should not be used to seal samples requiring volatile organic <br /> analysis to avoid potential contamination. 1 <br /> V. Health and Safety Considerations <br /> If lightning is present,discontinue sampling until 30 minutes after the last occurrence ' <br /> of lightning. <br /> VI. Procedure ' <br /> The following section describes the procedures to collect a Hydropunch®grab <br /> groundwater sample. <br /> 1. Identify site and Hydropunch®sample location in field notebook along with date, <br /> time, personnel,and weather conditions using indelible ink. ' <br /> 2. Use safety equipment as specified in the Health and Safety Plan. <br /> 3. Place plastic sheeting on the ground adjacent to the Hydropunch®sample point. I <br /> 4. Advance a soil boring to the desired depth using the direct-push technique as ' <br /> described in the Soil Boring Installation, Soil Sampling, and Borehole <br /> Abandonment SOP. <br /> CAI E4199 HydvpRK1+6'Rndw�'.e'S�nWk'9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.