My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
BILLING PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 12:00:02 PM
Creation date
11/1/2018 9:45:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM VF <br /> 10 UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 0-90-1 <br /> 1r <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S), <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3 <br /> BUSINESS SITE ADDRESS / �� �„n �d. 10 CITY 206' <br /> H.EQUIPMENT TES G AND PREVENTIVE MAWMANdE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 42632,2634 2638,264 1 <br /> 490.3& <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 49o3b <br /> III.MONITORING LOCATIONS <br /> i 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. L SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 34)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING TEE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> elz VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER: . v 490.7 MODEL#: %r(- 49042 <br /> LEAK SENSOR MANUFACTURER: r 490-9 MODEL#(S): Z/-2-6 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S1.(23 CCR§2643) 0-90 21 <br /> PANEL MANUFACTURER: 490-11 MODEL#: 49013 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 49015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49046 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> [34.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS El b.b.60 HOURS 490-22 <br /> zz <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.25 <br /> 490.26 <br /> ❑99.OTHER (Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check 0-H that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 428 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d UNDER VACUUM °90 29 <br /> PANEL MANUFACTURER: 490-30 <br /> MODEL#: J*ft 490-31 <br /> LEAK SENSOR MANUFACTURER 490.32 MODEL#(S): 26jg 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES;'b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES Xb.NO 0-90-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETE D 23 CCR 26 490.36 <br /> MLLDMANUFACTURER(S): ✓ 490-37 MODEL#(S):77-Zj:o2V o TP-M 490.3' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR( LLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS (23 CCR 62631 490-39 <br /> ELLD MANUFACTURER(S) 490'401 MODEL#(S): 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 69044 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY 1Z a.ANNUALLY b.EVERY 3 YEARS 0 c.OTHERS if 490-46490.47 <br /> 5.VISUAL PIPE MONITORING. 19048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> •Allowed for monilonag of unbwed emergency emaior fuel piping odv per HSC§25281.5(bX3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)I. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490--52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.