Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> • MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORATED USING THE FOLLOWING METHOD 490-54a <br /> X I.CONTINUOUS ELECTRONIC MONITORING 112.FLOAT AND CHAIN ASSEMBLY C13.ELECTRONIC STAND-ALONE 490-54b <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: a " 490 55 MODEL# 490-56 <br /> LEAK SENSOR MANUFACTURER: a,1A a 490-57 1 MODEL#(S): ZOA 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN <br /> ❑ a.YES b.NO 490.60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES 10-b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490.64b <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1) <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49D-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> g,,A, =.g!S <br /> finmonitoring/maintenance records are kept for this facility: <br /> 49o-69a ❑Visual Inspection Records 490.6ab ❑Tank integrity testing results 49M8C <br /> IR testing results(and supporting documentation records). 490-69d ❑ Tank gauging results(and supporting documentation records). 490.690- <br /> ❑ATG Testing results(and supporting documentation records).490-69r ❑ Corrosion Protection 60-day logs 490-68g <br /> ❑Equipment maintenance and calibration records. 490-69h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.690- <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILIT`'(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-699 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-696 <br /> ❑ OTHER(Specify):M691,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> /Fhe"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's rale with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information ggn specific monitoring proce res are attached.to this art.49-71 <br /> 'T oc� o✓e--4�'( ( Pr i✓C rc�,' ('lv� -fes�jes a/, fh M e c! �/s.p� C r t <br /> XI.kERSONNEL RESP SIBILITI <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following perso (sl responsible F)rperforming the monitoring and equipment maintenance <br /> NAME �' 490-7z TITLE ('Cie/-t, 4,r4- r- 490-73 <br /> NAMEL,(-0/ 490.74 TITLE 490.75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and Inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certifv that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> C• 4-- v, 8- I -ov <br /> Authonzed RepresentaiweN <br /> APPLICANT NAME(print): 490.78 APPLICANT TITLE: 490.79 <br /> P' <br /> UPCF UST-D(12/2007)3/4 <br />