My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:34:38 PM
Creation date
11/1/2018 10:32:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conduct fate and transport modeling for benzene. <br /> 04-27-94 PHSIEHD meet with the representative of the RP and the new consulting firm to discuss <br /> the WP to determine if the WP will address all areas of concern at the site. <br /> 05-09-94 PHSIEHD receives addendum to the April 18, 1994 workplan dated May 3, 1994. The <br /> addendum proposes to relocate the two SBs to one in the former tank pit and one to the <br /> south east of the former tank pit and to use continuous coring. The four proposed soil <br /> borings near the septic area will be reduced to one boring. The addendum also provides <br /> more information on the procedure to be used for the "Simple Green" study. <br /> 05-10-94 PHSIEHD sends letter to RP stating work proposed can begin upon securing the required <br /> permit for the work. <br /> 05-16-94 PHSIEHD receives permit application and issues permit for the work. <br /> 06-16-94 PHSIEHD visits site to observe the sampling and filtering of groundwater from MW#2, <br /> MW#3, and MW#5 for lead analysis. <br /> 08-10-94 PHS/EHD receives the "Report of Findings" dated August 1, 1994 reporting the results of <br /> the site investigation conducted during the week of May 25, 1994. <br /> S8#1 was drilled in the former tank pit area. The results showed residual levels of <br /> contamination in the deeper zone. <br /> S3#2 was drilled to the south east of the former tank pit. All soil samples from this boring <br /> did not show contamination. <br /> TABLE 1 <br /> SUMMARY OF SOIL ANALYTICAL LABORATORY RESi3LTS <br /> TANK PIT AREA <br /> Detected C anceutratious{ug(Ky) <br /> September].994 <br /> EPA EPA.Method 3020EPA.IMethod 8240 Method 29-3--M'Method Anromage S7droearbons Volatile <br /> Depth 418.1p Tota!Organic Carbon <br /> SAMPLE Rigs <br /> Rmuitin Dry Reporting <br /> TPH-G Benzene Toluene XTlene(s) E-benzene 1.2 I)Cd Benzene Toluene Xvlme{sl $-benzwe Wdeht roto b Limit <br /> SBI—; 445 � ads d,a �o Asn �0 10r.a 7.Osa f ,.o as as <br /> 581-6 66 1 d ad °d od ffi 46 t7 t0 45 nd oa as <br /> SBI-s6, s6 od 15 ud 9.9 ad I m m as m m as m <br /> SBI-61-5 61.5 d ad ad ad ad m m m ns I m I oa I as r <br /> SBI-71.5 71.3 ad od od od I ad as m I m oa as m m 1 <br /> SBI-76 I 76 ad ad ad I ad ad as m 3s m as 0.030 0.010 <br /> SBI-1 31 ad I ad ad od ' ad m 02 as as m as as <br /> 0246 16 ad adad od od as as as ba m m as <br /> 382 66 66 ad od ad I ad I ad as m m as as m I as i <br /> 82-76 76 od ad td I ad nd I m as as as I m ad 0.010 <br /> ample Date: XaT 26,1994 <br /> 3.9&.hLxt«- W W fes.. <br /> - �arb- <br /> - Saw4m:md r ft wa a!dcWcd=ON*in <br /> - Yat�Yy,d <br />?9.G . nmi Ponnleam.Hyd,veuedm u Gawdw <br />
The URL can be used to link to this page
Your browser does not support the video tag.