Laserfiche WebLink
landfill (if TPH-G exceeds 1,000 mg/Kg) Because the soils will be handled as a hazardous <br /> waste in these circumstances, manifesting procedures and registered waste haulers will be <br />' utilized <br /> 3.3 Future Planned Activities <br />' In chronological order, the following activities are currently planned <br />' November 1992 <br /> * Complete additional sampling and analysis of the soil stockpile <br />' • Complete geotechnical evaluation of potential effects of the proposed excavation on the <br />' building onsite <br /> • Schedule a meeting with County staff to discuss the revised remedial plan <br />' December 1992 <br />' ® Complete the fourth quarter 1992 sampling event <br /> O Commence field operations to complete the additional excavation unless a public <br /> comment and review process is required by the County <br /> I <br /> I � <br /> I <br /> I <br />' S1rKC\M5\AREG3QTR WP 13 i1i13 <br />