My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2012-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 9:51:31 AM
Creation date
11/1/2018 10:44:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2012-2013
FileName_PostFix
2012-2013
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bravo Conversion Frame <br />Installation Instructions <br />The B2000 Conversion Frame from S. Bravo Systems, Inc. MUST be installed by, and <br />only by, Bravo Certified Installation Contractors. Details can be found at <br />www.sbravo.com/cert.htm <br />YOU MUST CLOSELY ADHERE TO ALL DIRECTIONS AND WARNINGS INDICATED ON THE <br />PRODUCT OR CONTAINED IN THESE INSTALLATION INSTRUCTIONS. <br />For assistance please call Bravo for technical support at (800) 28 -BRAVO. <br />Outside the U.S.A. please call (323) 888-4133. <br />SAFETY FIRST! S. Bravo Systems, Inc. urges you to carefully adhere to the <br />normal safety procedures and precautions followed by your company. Please <br />follow the mandates and compliances decreed by OSHA, local, State and feder- <br />al regulations regarding the use of this product. <br />YOU MUST check all your drawings / site plans for <br />errors or possible problems. Make sure you have all <br />necessary materials / tools on-site before Installation. <br />FOR A MATERIALS CHECKLIST, SEE PAGE 3 <br />A -UPGRADING TO NEW DISPENSER <br />Always follow your company's normally <br />uzilrecommended safety procedures for working on <br />a dispenser and dispenser containment devices. <br />Al - Remove existing dispenser from island. <br />1 ii-ConversionFrame 1-14-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.