Laserfiche WebLink
i • <br /> ����Mff <br /> TD. <br /> sari An Regio"l Transit District <br /> It should, however, be mentioned that the SJRTD's source reduction measures <br /> and their associated goals shall be achieved by using adaptive management. <br /> Whereby, the source reduction measures are implemented in the order of <br /> economic and operational feasibility as well as ease of implementation. In other <br /> words, the first source reduction measure or combination of measures that <br /> achieve the numerical goals and objectives (based on clear and convincing cost- <br /> benefit analysis), the SJRTD reserves the right to not implement the other <br /> measures. <br /> Table 4 Numerical Goals and Schedule of Implementation <br /> Hw waste CWC Management Administrative Process Input Schedul Numeric <br /> Stream and controls: optimization, changes a of al goals <br /> subject to Operational production and Impleme and <br /> SB 14 Control process materials ntation quantitie <br /> changes: substitution s <br /> WOil,water 222 Yes Yes Yes Shall be 2.5 % 10 %: <br /> nd sludge explored will be 4,276.9 <br /> waste achieved kg or <br /> every 1,343 <br /> year or gallons <br /> total of <br /> 10% <br /> 2.Aquepous 134 Shall be Yes Yes Yes 2.5 % 10%: <br /> parts explored will be 148.9 kg <br /> washer achieved or 46 <br /> every gallons <br /> year or <br /> total of <br /> 10% <br /> 3.oily 223 Yes Yes 2.5 % 10 %: <br /> absorbent will be 18.1 kg <br /> achieved <br /> every <br /> year or <br /> total of <br /> 10% <br /> Note: all of the above measures shall be implemented by using an adaptive management, <br /> whereby the goals shall be achieved by using one measure or combination of measures. <br /> 40 <br />