Laserfiche WebLink
9 0 <br /> • (vii)Transportation and warehousing,one million five hundred thousand <br /> dollars($1,500,000). <br /> (J)A manufacturing enterprise exceeding 250 employees. <br /> (K) A health care facility exceeding 150 beds or one million five hundred <br /> thousand dollars($1,500,000) in annual gross receipts. <br /> 4.2 Options For a Small Business <br /> A generator that meets the definition of a small business and satisfies the SB 14 <br /> applicability criteria outlined in Chapter 2,must also comply with SB 14.In place of <br /> the Plan, a small business may choose to complete any one of the following set of <br /> documents: <br /> • Hazardous Waste Source Reduction Compliance Checklist (Compliance <br /> Checklist) <br /> • Industry-specific Waste Audit Study plus Sections 1, 3, 4, 5 and 6 from the <br /> Compliance Checklist <br /> • Industry-specific Hazardous Waste Minimization Checklist and Assessment <br /> Manual plus Sections 1,3,4, 5 and 6 from the Compliance Checklist <br /> Small businesses may find that completing the forms in the Compliance Checklist <br /> or appropriate Waste Audit Study easier than completing a Plan. OPPTD developed <br /> the Compliance Checklist for use by companies that are not addressed by the <br /> industry-specific Waste Audit Studies and Hazardous Waste Minimization Checklist <br /> • and Assessment Manuals.These documentsmay be used inplace ofthe Plan by small <br /> businesses that have inadequate technical and financial resources for obtaining <br /> information and assessing source reduction methods. The Compliance Checklist, <br /> Waste Audit Studies,and Checklist and Assessment Manuals listed in Appendix E <br /> are available from OPPTD. To obtain SB 14 documents and contact OPPTD,refer <br /> to the subheading in Chapter 1. <br /> As an alternative to preparing a Performance Report required by SB 14,a small <br /> business may use its most recent biennial generator report (BGR), as required by <br /> section 66262.41 of the California Code of Regulations,as the Performance Report <br /> required by SB 14. <br /> Like all generators subject to SB 14,small businesses must prepare a Summary <br /> Progress Report(SPR) and submit it to OPPTD by September 1, 2003. <br /> 4.3 Options For Multiple Sites <br /> A generator that owns or operates multiple sites with similar processes,operations, <br /> and waste streams may prepare a single,multiple-site Plan,Performance Report,and <br /> SPR addressing all of the sites. A generator that chooses this option may avoid <br /> unnecessary duplication of work. The generator must also keep a copy of the Plan, <br /> Performance Report,and SPR at each site. <br /> 4 >• <br /> 24 <br />