Laserfiche WebLink
• 4.4 Options For a Complex Site <br /> A generator that owns a complex site with multiple operations that are managed as <br /> independent businesses may choose to prepare a separate Plan,Performance Report, <br /> .md SPR foreach operation that is independently managed. An example of complex <br /> site is a site where hazardous wastes generated at each operation are managed by a <br /> separate environmental coordinator or production unit. A generator that chooses this <br /> option may avoid the burden of coordinating activities between businesses or <br /> operations that would otherwise act independently. <br /> A Source Reduction Success- <br /> The Martin Luther King 1r./Charles R. Drew Medical Center <br /> f <br /> The Martin Luther King Jr,/Charles R.Drew Medical Center(KDMC)is direct result of the <br /> historic Watts Riots of 1965. Following the riots,former Governor Pat Brown appointed John <br /> A.McCone to head a commission to study the causes of the riots. The McCone Commission <br /> Report identified the absence of accessible quality health care as a major contributor to the civil <br /> disturbance. <br /> I <br /> KDMC is a short-term general acute care community teaching facility,a Level l:Trauma <br /> Center, and a Level Ill Newborn intensive Care Unit. The facility has 14approved clinical <br /> residency training programs,and operates a Paramedic Base Station and emergency heliport.. <br /> The following are afew of the source reduction methods implemented by the hospital.:. <br /> • • Maintenance workers manuallywashed paint guns in the paint shop with thinner. <br /> Manual washing released thinner into the surrounding work space and generated thinner <br /> waste. A Herkules.Paint.Gun Washer and Recycler that uses compressed air was <br /> .installed in the paint shop in mid-1994. Practically all the used thinner is now captured <br /> as liquid waste.. The washer effectively cleans the paint gun and reuses the thinner for <br /> additional washes. Thinner waste was reduced by 28%,or 500 pounds per year. The: <br /> capital cost was$975 and operation and maintenance:costs are$100 a year. <br /> • Laboratory technicians manually dipped slides with blood smear into the stains.:The <br /> manual process takes 12 to 15 minutes.A Wescor Aerospray Hematology Slide Stainer. <br /> was installed in January 1995. The automatic slide stainer sprays the slides with the <br /> stains,minimizing the generation of alcohol waste.Themachine canacplace themanual.. <br /> staining process for most slides with the exception of bone marrow slides. The machine <br /> takes Jcss than 10 tninmes. The slide stainer costs$6000 and has annual recurring costs <br /> of$600.Annual savings in chemicals and waste disposal are$930 and$50,respectively. <br /> The use of the automatic slide stainer is estimated to save minimum of I person-hour <br /> per day. Since the.Hematology Laboratory operates 365 days per year,the automatic <br /> stainer saves approximately 365 person-hours per year or$9125 per year.. <br /> • Employees used or serviced mercury sphygmomanometers daily, and a number of <br /> mercury spills resulted from breakages.Replacement of mercury sphygmomanometers <br /> in the patient cue areas with TycosR Aneroid Sphygmomanometers was completed in <br /> 1994. The aneroid sphygmomanometers are accurate and do not contain mercury. The <br /> estimated hazardous waste source reduction was 75%,or 150 pounds per year. <br /> • 25 i <br />