My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2200 - Hazardous Waste Program
>
PR0521335
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:38:01 AM
Creation date
11/1/2018 11:02:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0521335
PE
2227
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0521335\COMPLIANCE INFO 2000-2009.PDF
QuestysFileName
COMPLIANCE INFO 2000-2009
QuestysRecordDate
3/24/2016 5:51:06 PM
QuestysRecordID
3038131
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 5.6 Information on Selected Source Reduction Measures <br /> The Plan must identify each source reduction measure selected for implementation <br /> as aresult of the evaluation. The Plan must describe each selected measure in detail,using <br /> narratives, photographs, figures and/or data. The <br /> description of each selected measure must be in sufficient <br /> detail to convey an understanding that would allow other <br /> generators to transfer the measure to a site with similar SAp; <br /> processes, operations or procedures. At a minimum,the Ti <br /> seven evaluation factors must be addressed in a narrative <br /> where appropriate.The Plan must also addressthe predicted <br /> effect that selected measures would have on the capacity Enter selected source <br /> and efficiency of related processes and operations. reduction measures for <br /> If a generator considers information in the Plan a trade each waste stream on the <br /> secret orproprietary,the pages containingthatinformsecond line of Section 25ation ofyour SPR <br /> should be labeled accordingly. See Chapter 8 for more <br /> information on labeling and reporting trade secret <br /> information. <br /> 5.7 Evaluate Multimedia Effects <br /> SB 14 specifies that implemented source reduction measures can not merely transfer the <br /> waste load from one environmental medium (air, land, or water)to another. The Plan <br /> must include an evaluation and,to the extent practicable,a qualification of the effects of <br /> the chosen alternative on all three environmental media. <br /> 5.8 List Rejected Measures <br /> The Plan must include a list of source reduction measures that were rejected before <br /> undertakingthedetailed evaluation- The rationale for theirrejection must be stated. Also, <br /> if some waste streams were considered to not have viable source reduction alternatives, <br /> the Plan must include a brief description of the good-faith effort to identify source <br /> reduction alternatives. <br /> 5.9 Schedule Steps Toward implementation <br /> The Plan must include a timetable for implementation of <br /> all selected source reduction measures. The timetable 5pp <br /> should include,at a minimum,starting and finishing dates T i <br /> for implementation. A simple action plan with key dates <br /> or milestones would be desirable for lengthy or complex <br /> projects. Enter the starting date <br /> (month and year) for <br /> implementation of each <br /> 5.7o Set a Numerical Goal source reduction measure <br /> The Plan must specify a numerical goal that spans the four on third line of Section 25 <br /> years from the first day of the calendar year when the Plan of your SPR <br /> must be prepared to the last day of the next reporting year. <br /> 4't / <br />
The URL can be used to link to this page
Your browser does not support the video tag.