Laserfiche WebLink
For example,the numerical goal in the Plan that must be prepared by September 1, <br /> 2003 covers January 1, 2003 through December 31, 2006. <br /> The four-year numerical goal is not simply a reflection of the generator's intended <br /> source reduction under SB 14. It is an estimate of the source reduction that the site <br /> could optimally strive to achieve over the four-year period. The goal, a single <br /> numerical percentage,reflects the business'source reduction vision and commitment. <br /> The goal must reflect waste stream reductions due only to source reduction and <br /> exclude effects due to production or economic influences. <br /> Calculate the four-year numerical goal(as percent reduction)using the following <br /> equation: <br /> Total weight of lrazardow:s and extremely ha-rardous waste reduced <br /> at the site if source veduction practices am optimh?ed . <br /> ------------- ----------------------------- --- --------.--_----------------- X 100 <br /> 'Pea=rl weight of hazardous and extremely haZardGUs waste generated <br /> if Source reduction measures are not implemented at tate site <br /> 5.91 Certify the Pian Technical and Financial Certification <br /> iThe Plan must have a technical certification and a financial certification. The <br /> technical certification of the Plan can be completed by any one of the following <br /> people: <br /> • an engineer who is registered in California and has demonstrated expertise in <br /> hazardous waste management; <br /> • an environmental assessor who is registered in California and has demonstrated <br /> expertise in hazardous waste management; or <br /> • an individual in your company who is responsible for the processes and <br /> operations of the site,regardless of any professional registrations. <br /> The person performing the technical certification of the Plan must certify all ofthe <br /> following: <br /> • The Plan identifies and addresses all of the major waste streams at the site. <br /> • The five approaches to source reduction have been considered. <br /> • The Plan fully explains the decision process used to determine which measures <br /> to implement,including the rationale for rejecting the measures that will not be <br /> implemented. The Plan includes an implementation schedule. <br /> • The Plan does not merely shift hazardous waste from one environmental <br /> medium(air,water,or land)to another by increasing emissions or discharges to <br /> air,water,or land. <br /> J2 / <br />