Laserfiche WebLink
t <br /> 507.14 INERTING OF TAi+W <br /> Whenever WC personnel must be present during removal or <br /> transport of fuel storage tanks, the SSo or designee must determine <br /> whether or not the procedures to be used by the firm, responsible <br /> for tank removal/transport agree with procedures recommended by the <br /> American Petroleum Institute (API) . If the firm's procedures, � <br /> especially those addressing removal/inactivation of flammable j <br /> vapors, disagree substantially with API's procedures, the PM and <br /> 1 HSO must be notified immediately (by telephone, if possible) . In <br /> turn, the PM shall inform the client that WC personnel will not <br /> a <br /> report to the site during tank/removal operations unless proper <br /> procedures are used. If the firm responsible for :tank <br /> removal/transport is under subcontract to WC, it must be required _- <br /> �� to follow API procedures. <br /> G= � <br /> 14 <br /> i <br /> /H&S2 <br /> HAS-PRO507 HS-507-10 November 1990 <br /> f _ <br />