My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012540
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1235
>
3500 - Local Oversight Program
>
PR0543389
>
ARCHIVED REPORTS XR0012540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 7:40:55 PM
Creation date
11/1/2018 11:13:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0012540
FileName_PostFix
XR0012540
RECORD_ID
PR0543389
PE
3528
FACILITY_ID
FA0004512
FACILITY_NAME
MAJOR STATIONS
STREET_NUMBER
1235
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11533055
CURRENT_STATUS
02
SITE_LOCATION
1235 E ALPINE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br /> t <br /> OPERATING PROCEDURE NO. HS-509 <br /> fig <br /> j ' 509.0 SAFETY GUIDELINES FOR DRILLING INTO MOIL ANA ROCKS <br /> 509.1 PURPOSE <br /> Ira <br /> i <br /> I Ir <br /> � # The purpose of this operating procedure is to provide <br /> guidelines for safe conduct of drilling operations with truck- <br /> :. mounted and other engine-powered, drill rigs. The procedure <br /> k.4 <br /> addresses off-road movement of drill rigs, overhead and buried <br /> utilities, use of augers, rotary and core drilling, and other - <br /> drilling operations and activities. <br /> w i <br /> 509.2 APPLICATION <br /> F ' <br /> rte. i <br /> ,- ` The guidelines shall be applied in all WCC/WCFS projects <br /> in which truck-mounted, or other engine-powered, drill, rigs are <br /> used. The guidelines are applicable to WCC employees and WCC award <br /> rigs. For drill rigs operated by contractors, drill rig safety is <br /> the responsibility of the contractor. <br /> W t <br /> 509.3 RESPONSIBILITY AND AUTHORITY i <br /> Brill rig:safety and maintenance is the responsibility of <br /> the drill rig operator. i <br /> HAS-PRO509 . HS-509-1. November 1990 <br /> - <br /> � r <br /> rm <br />
The URL can be used to link to this page
Your browser does not support the video tag.