Laserfiche WebLink
acetate sleeve will be opened and the soil transfer to TerraCore bottles for analysis of <br /> VOCs. Soil for the other analyses (SVOCs, metals, and dioxins/furans) will be <br /> retained in the acetate sleeve. The samples will be collected from the surface and <br /> approximately 2.5, 5, 10, 25, and 40(or just above capillary fringe) feet bgs. <br /> Soil samples for geotechnical analysis will be collected using a Geoprobe. The <br /> samples will be collected in acetate sleeves during drilling of soil gas points. <br /> 5.5.3.3. Field Equipment <br /> Sampling equipment includes the following: <br /> • Maps/plot plan <br /> • Safety equipment, as specified in the site-specific Health and Safety Plan <br /> • Tape measure <br /> • Camera and film <br /> • Sample tubes and caps <br /> • Zip-locked plastic bags (gallon and quart size) <br /> • Logbook <br /> • Chain-of-custody forms <br /> • Custody seals <br /> • Field data sheets and sample labels <br /> • Decontamination supplies <br /> • Nitrile gloves <br /> • Geoprobe and related supplies <br /> • Bentonite grout and cement <br /> 5.5.4. Sample Containers and Preservatives <br /> Soil vapor samples will be collected according to the 2012 DISC Advisory-Active Soil <br /> Gas Investigation (DTSC 2012). Soil vapor samples will be collected directly in glass <br /> syringes. Samples will be analyzed onsite by a mobile laboratory. <br /> The soil samples will be collected in 2-inch diameter acetate sleeves. A portion of the <br /> sleeve will be opened to transfer soil to TerraCore bottles per EPA Method 5035A for <br /> VOC analysis. Soil for the other analyses will be retained in the sleeve/tube in <br /> approximate 6-inch lengths (if the diameter of the sleeve is less than 2 inches, the sample <br /> length will be 8-12 inches). The sample tube ends will be covered with small sheets of <br /> Teflon and capped. <br /> The samples will be labeled at the sample location. No preservatives are necessary for <br /> the acetate sleeve. Soil samples for VOC and 1-4-dioxane will be collected using <br /> TerraCore samplers which will be supplied by the laboratory, pre-weighed, with the <br /> appropriate preservatives. <br /> Soil Gas and Soil Sampling Work Plan—Rev.4 7693-05 <br /> Former Kearney-KPF Facility Dudek <br /> Stockton,CA 16 September 2013 <br />