Laserfiche WebLink
Frank Dellechai• • <br /> Page 3 <br /> January 24 , 1989 <br /> would be costly, about $70K for each cluster, and that they <br /> had to do what was best for the facility and at the same time <br /> act prudently with their client's money. They also said that <br /> they would have to obtain rights to access private property in <br /> both cases. <br /> DHS reasoned that putting a cluster of wells in the north and <br /> in the south would be good for the facility. These wells <br /> would provide good data, would be constructed in the same way <br /> the other wells would be constructed, would be constructed by <br /> the same contractor, and with the changes in water table <br /> levels and in gradient, both seasonally and yearly, it would <br /> be best to compare data from the same time period. And if DHS <br /> had better/complete data now, DHS could expedite regulatory <br /> duties relating to the site. <br /> It was agreed that the contractors would give serious <br /> consideration to adding the two well clusters to their current <br /> proposal, would talk to Kearney officials about this proposal, <br /> and get back to DHS with an answer. <br /> DHS then asked whether or not there was a cluster of wells <br /> proposed for the center of the facility. The contractors <br /> responded that one intermediate well, KI-4 , was planned for <br /> the center of the facility, and the Deep Production Well (DPW) <br /> was in the vicinity. DHS then asked if the contractors could <br /> put in one deep well and one shallow well in the vicinity of <br /> KI-4 to form a cluster. The contractors said that having a <br /> cluster in the center of the facility made good sense, but <br /> they would rather move KI-4 over near SMW-5 or TP-1A and add <br /> one more deep well than add a shallow and a deep well . This <br /> would provide a cluster of wells in the center of the <br /> facility. DHS agreed to this request. <br /> The topic of conversation turned to screen lengths. The <br /> proposed shallow wells (KS series) will have twenty foot <br /> screens; the intermediate wells (KI series) will have ten foot <br /> screens; and the deep wells (KD series) will have twenty foot <br /> or longer screens. DHS took the position that ten foot <br /> screens in the deep wells were best. The contractors <br /> disagreed. DHS stated strongly that any screen greater than <br /> twenty feet in length would be unacceptable. The contractors <br /> suggested that after analyzing the proposed exploration <br /> borehole data and ascertaining the geology/1 ithology of the <br /> area they would be willing to discuss screen length for the <br /> deep wells. It was also agreed upon to discuss the proposed <br /> method of well construction at a later date. Deep well screen <br /> length and method of construction are to be discussed with DHS <br /> before construction begins. <br />