Frank Dellechai• • <br /> Page 2 <br /> January 24, 1989 <br /> The discussion shifted to Soil Sample Collection. Rationale <br /> for the nine background locations was discussed. The <br /> contractors said they chose the four proposed background <br /> surface soil sample locations outside of the inner fenced <br /> perimeter area because this area had never been part of the <br /> plant operation. DHS noted that there were no proposed sample <br /> locations in either the eastern or southern areas of the <br /> facility. The contractor said that the eastern boundary was <br /> covered by asphalt and that soil samples from the southern <br /> boundary had been taken by a previous contractor. <br /> DHS asked if it were possible to substitute one of the <br /> proposed locations along the northern boundary for a proposed <br /> location along the eastern boundary near the carport, and add <br /> an additional location along the southern boundary. The <br /> contractors agreed to this change. <br /> DHS then asked what protocols would be used for the analyses. <br /> The contractors said that these soils were to be analyzed for <br /> metals (6010) but not organics. A lengthy discussion by both <br /> parties ensued about whether or not the proposed background <br /> surface soil samples should/would be analyzed for organics. <br /> DHS pointed out that the purpose of the assessment is to <br /> collect data and that this data is needed to establish whether <br /> or not there are solvents on site, and that this approach is <br /> being taken at other sites. It was agreed that both <br /> protocols, 6010 and 8010, would be done. This analysis also <br /> applies to the proposed surface soil sample locations in the <br /> depression area. <br /> The discussion then moved to the subject of the eleven newly <br /> proposed wells and their locations. The contractors <br /> emphasized that the facility was in an assessment monitoring <br /> mode and not in a detection monitoring mode, and as such the <br /> goal is to collect data to assess the problem so that they can <br /> design a solution to the problem. The contractors said they <br /> were going to instrument three wells (TP-1A, TP-2A, TP-3A) to <br /> see how often the gradient changes and if those changes are <br /> related to pumping in the area by the California Water Service <br /> production wells, or if the changes in gradient are regional. <br /> DHS noted that there was a lack of wells north of the site and <br /> south of the site. More specifically DHS saw the northern and <br /> southern boundaries of the facility as being open, and <br /> proposed that a cluster of wells be established north of <br /> Alpine Road, and south of the railroad spur (south of Pond 1) . <br /> The contractors said that putting a cluster of wells to the <br /> north and to the south was a logical avenue to pursue as a <br /> follow-on to their current plan. They also said that this <br />