My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2200 - Hazardous Waste Program
>
PR0220082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:12:46 PM
Creation date
11/1/2018 12:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220082
PE
2220
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\PR0220082\COMPLIANCE INFO 1989 - 1992.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 1992
QuestysRecordDate
9/22/2017 9:10:01 PM
QuestysRecordID
3256138
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document Number: 909 R 5003 <br /> w Procedure Rev: 12 Date: 1/22/13 <br /> EMERGENCY RESPONSE PROCEDURES <br /> 6 <br /> EQUIPMENT Sfil1T DOWN/START UP PROCEDURES <br /> 3 <br /> 4 i e Each department is responsible for the development and implementation of <br /> 1"• ___I r emergency equipment shut down procedures. The procedures are intended to allow y ; rf �' g 1 a for the rapid shut down of major manufacturing equipment or processes without undue <br /> r ,� g • o- I ;f y endangerment to employees and/or contractors during an evacuation. <br /> a I 13e <br /> 1 IA Once the emergency is over and approval is given for employees and/or contractors to <br /> m ♦•O ' is X0;1, < reenter the facility, procedures are needed to bring any equipment and/or process <br /> W r 1 a back on line. Start up procedures will also be developed. Each department will be <br /> i F responsible for emergency shutdown/startup training. <br /> ' <br /> O r a <br /> TRAINING <br /> Y31 2 y & <br /> • �i` a New employees will receive this training as part of their initial new employee training. <br /> Annual refresher training will be provided to all employees. <br /> Training at a minimum will consist of the following: <br /> W a � 93; <br /> a know where the assembly areas are located <br /> know evacuation procedures <br /> Fyg u <br /> CS $ ; d _ a Additional training will be given to employees designated as emergency shut <br /> down/start up personnel. Training should consist of identifying what procedures are to <br /> c o a be taken for the shut down/start up of equipment/process and responsibility of each <br /> r m team member. Annual refresher training will be given to these employees. <br /> u r] EVACUATION DRILLS <br /> e @ 9 <br /> W c� ; • 0 The facility will conduct partial or plant wide evacuation drill(s) on an annual basis. <br /> I "s Where appropriate,the drill(s)will allow each department to practice emergency shut <br /> e a Q a a down/start up procedures. The drill(s)will be held for all shifts and upon completion, <br /> pg 5 0 $$ Management will make assessment of the drill(s)and prepare recommendations for <br /> improvements if warranted. <br /> m s; <br /> H Dooument in end Sbnings\utm\Local Settings\Temporary intemet Files\Contmt.OudookVQ9w31RY\CAPA <br /> CCR 66265 55.doc Pose 16 of 69 <br /> b'F.a paper Coplesare NWcommilou stamped In RE 'Ca le Omummr.Ce WIWWMIMapWMIn OSMOEatWm <br /> ♦7 rt V CaReswbNwl a RED Twedlee Bowmen aDmpw l be OBSOLETE 24 awmftm6111=14 157 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.