My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2200 - Hazardous Waste Program
>
PR0220082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:12:46 PM
Creation date
11/1/2018 12:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220082
PE
2220
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\PR0220082\COMPLIANCE INFO 1989 - 1992.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 1992
QuestysRecordDate
9/22/2017 9:10:01 PM
QuestysRecordID
3256138
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document Number: 909 R 5003 Document Number: 909 R 5003 <br /> Procedure Rev: 12 Date: 1/22/13 Procedure Rev: 12 Date: 1/22/13 <br /> EMERGENCY RESPONSE PROCEDURES EMERGENCY RESPONSE PROCEDURES <br /> Incident Command System <br /> In the case of certain emergencies,Pilkington will utilize the Incident Command Incident Command shall,if appropriate,include: <br /> System. Pilkington will participate in any joint incident command system with <br /> • responding agencies,to facilitate a timely response to the emergency. . Establishment of a command centers,equipmentipersonnel staging areas,and <br /> Roles of the Pilkington Incident Command Team are as follows: communication system. <br /> Plant Manager (incident commander) shall coordinate and make • Communication system which will consider communication between the <br /> available all necessary resources for an effective response and shall command center,emergency responders, and plant security.Communications is <br /> maintain communications with corporate. conducted via Nextel phones issued to all management personnel. Battery <br /> operated radios are provided to all other personnel throughout plant. Radios and <br /> Area Managers shall provide technical assistance and coordinate the Cell phones have rechargeable batteries which are periodically replaced when no <br /> use of materials/equipment necessary for response as well as trained longer viable. <br /> personnel to assist in incident control. <br /> • EHS/BATCH/FURNACE AND TECHNICAL Manager shall be Establishment of individuals most knowledgeable of area/process where incident <br /> responsible for securing area,accountability of employees,and crowd is occurring to provide technical support and direction. <br /> control.EHS/BATCH/FURNACE AND TECHNICAL Manager shall <br /> determine if the incident poses a threat to the safety and health of <br /> employees. In addition,shall assess the situation to determine if <br /> hazardous materials are present and whether they pose a threat to <br /> responders,the surrounding community or the environment.Will <br /> provide technical information including Material Safety Data Sheets. <br /> EHS/BATCH/FURNACE AND TECHNICAL Manager shall act as <br /> incident commander. <br /> • Human Resources Manager shall be responsible for communications <br /> with media. <br /> • If the emergency occurs during non-business hours, the incident <br /> commander shall be the highest ranking manager/supervisor on-site. <br /> Once appropriate personnel arrive on-site, the incident commander <br /> may change. <br /> Document in and Scfto ss\nvan\L CEi Settings\Temporary Internet Files\Content,OutlookUQ9W31RY\CAPA Document in and Settings\mranU.ocal Settings\Tempontry intennet FilwTontencOuflook\JQ9W3 I RY\CAPA <br /> CCR 66265 55A. Page 15 of69 CCR 66265 55A. Page 16 of 69 <br /> Paver COMM OM Not controlled u,irca.dmped In RED•cmtralea Dowmenf.CwtMIW wnlcn eppan In QSIRDS atattoI Paper Cogacareaa CODUMW urb.et•mw•In RED-cmlra led thmoxn M'.cantralea vnlonapneom 1n GRINKO ataEaee. <br /> CagaewlNM a RED GanRtll[G nwmeM'g14ty HII b OBBIXETE 2a Mun M1omdltrzDtd 15]PM IN OBSOuTE N M rs Mm Gn IC0td 1'.5]PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.