Laserfiche WebLink
Document Number: 909 R 5003 Document Number: 909 R 5003 <br /> Procedure Rev: 12 Date: 1122113 Procedure Rev: 12 Date: 1/22/13 <br /> EMERGENCY RESPONSE PROCEDURES EMERGENCY RESPONSE PROCEDURES <br /> Diesel Fuel <br /> Diesel fuel is located in three tanks:a 10,000 gallon tank south of the furnace building, Tra1nIRE <br /> a 1,000 gallon tank south of the fumace immediately outside the (former) standby All members of management staff will receive training to understand the components <br /> generator door,and a 1,000 gallon tank north of the furnace building. Diesel is used of this plan. Meetings will be scheduled as needed to review the plan and address <br /> for heavy equipment fuel and as generator and fan motor fuel. The 10,000 gallon tank outstanding issues. The EHS Manager will be responsible for providing this plan to all <br /> (south side) and 1,000 gallon tank, on the north side, have secondary containment. appropriate employees and/or Contractors and emergency agencies. <br /> The 1,000 gallon tank on the south side is a double wall tank eliminating the need for <br /> secondary containment. As appropriate,practice drills will be held for the purpose of training personnel.Joint <br /> training exercises with emergency response agencies(i.e.,fire department)may be <br /> held. <br /> The EHS Manager will maintain appropriate training as required by federal and state <br /> regulations. Facility employees and/or Contractors will receive basic awareness <br /> training(a component of the Employment Orientation/HazCnm training)in a sufficient <br /> manner as to allow them to respond in a manner which maintains the safety of the <br /> employee and/or Contractor and allows for the,proper reporting of emergencies. <br /> Those employees and/or Contractors required to respond and assist in the cleaning up <br /> of small releases will receive additional on-site training,appropriate with the types of <br /> chemicals found on-site and level of response. <br /> Document in and Seitingsittlranll ocal Settings\Temporary Internet FilesTonientt_GutlookUQ9w3IRY1CAPA Document in and SettingsltttranTocal SettingslTempurdry Internet Fi1eslConlent.0ut1uokUQ9W3I RYICAPA <br /> CCR 66265 55.doc Page 37 of 69 CCR 66265 55,doc Page 3 S or 69 <br /> Paper Copies arm NoLcontrolled unless stamped In RED-Controlled Oo rnent'.Controlled version appears In 059000 database. Paper Copies am Not Controlled unless stamped In REP"ControlledDocument'.Controlled Version appears In QS9000 database, <br /> Cois"withaut a RED"Controlled Cacumenr stamp mil be OBSOLETE 24 hours from Ell IM14 1'.57 PM Copues with.W a RED"ControHed Documenr stamp.[[be OBSOLETE 24 hows ham B!1 SR014 1.57 PM <br />