My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2200 - Hazardous Waste Program
>
PR0220082
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 2:12:46 PM
Creation date
11/1/2018 12:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220082
PE
2220
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\PR0220082\COMPLIANCE INFO 1989 - 1992.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 1992
QuestysRecordDate
9/22/2017 9:10:01 PM
QuestysRecordID
3256138
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
954
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINGENCY AND EMERGENCY PROCEDURES <br /> GENERAL AND SITE SPECIFIC <br /> The purpose of these procedures is to provide guidance in the event <br /> of an emergency. Erickson's Site Emergency Coordinator will be the <br /> crew leader (Project Manager, Supervisor, Leadman, or Foreman) on <br /> duty when an incident occurs. <br /> An "on-call" company representative will be available by telephone <br /> and/or pager communication 24 hours a day. <br /> A. Coordination Prior to Starting a Job, in the order shown: <br /> 1. Prior to beginning a project with a new client, determine <br /> who will assume the lead on emergency response. <br /> 2 . Obtain the Clients procedures for evacuation and <br /> notification of the appropriate state or local <br /> authorities with designated response roles if their <br /> assistance is needed, i.e. OES, DTSC, police and/or fire <br /> department, ambulance, transportation, etc. <br /> 3 . In the event of emergency, notify Client Emergency <br /> Coordinator and Erickson Operations Management. <br /> 4 . Unless otherwise designated by the client, Erickson will <br /> assume the lead role on emergency response. <br /> B. Response to a Release of Hazardous Materials/Wastes: <br /> 1. Inform Client Emergency Coordinator of the location, <br /> material released, and extent of the release. <br /> 2 . Notify Erickson Operations Management, with all necessary <br /> information including the approximate quantity, the type <br /> of material released, and whether the release has been <br /> corrected or is correctable. Evacuate the immediate area <br /> to an up-wind location from the discharge if the released <br /> material poses a hazardous situation, or if the nature of <br /> the released material is unknown. <br /> 3 . The Client Emergency Coordinator, and/or Erickson <br /> Management representative, must evaluate the release <br /> condition and instruct site personnel on corrective <br /> measures, or call departments with designated response <br /> roles. <br /> 4. Erickson personnel will be available to initiate spill <br /> release abatement or assist the Client as instructed. <br /> 5. If Erickson assumes the lead role, identify the location, <br /> the nature of the emergency such as a release, fire or <br />
The URL can be used to link to this page
Your browser does not support the video tag.