Laserfiche WebLink
Breaks in the enclosure will be allowed at ceiling level (about eight feet) for ventilation <br />purposes. These openings may be narrowed if additional dust control management is <br />determined to be necessary. <br />WORK PROCEDURES <br />Work procedures will comply with all applicable federal, state and local rules, regulations, <br />and laws governing the handling of asbestos -containing materials. All ACM to be <br />excavated will be handled wet. Intact poly bags will be HEPA vacuumed prior to transport <br />for disposal and ruptured bags will be rebagged prior to transport for disposal. All debris <br />that may have spilled as a result of ruptured bags will be HEPA vacuumed and bagged <br />for disposal using two 6 -mil poly bags with required labels. All excavated bags will be <br />disposed of within the same disposal site and will be handled in full compliance with the <br />law. <br />The "grey" glass batch material was originally disposed of in "Rhino" reinforced container <br />bags. We expect that the bags will be excavated generally intact, but that some tearing <br />may have occurred. Intact original disposal bags will not be opened. Torn bags will be <br />carefully repackaged into poly -lined fiber drums. Uncontained "grey" glass batch waste <br />materials will be vacuumed and packaged into the fiber drums. The excavation will be <br />judged to be complete when it is visually free of "grey" glass batch material. <br />Transportation off-site will be arranged through a licensed hazardous waste transporter. <br />After the waste is properly characterized, LOF will arrange for disposal at an appropriately <br />licensed facility. <br />PERSONAL PROTECTIVE EQUIPMENT <br />All personnel entering the enclosure will wear two full-body Tyvek (or equivalent) coveralls, <br />the outer layer of which will be disposed of upon exiting, steel -toed rubber boots, gloves, <br />and at least half -mask respirators equipped with HEPA cartridges. <br />DECONTAMINATION <br />A shower will be provided adjacent to the work area for personnel decontamination. In <br />general, showering will be required at the end of each workshift or when an employee <br />must leave the immediate work area. The shower requirements may be increased if <br />working conditions and associated dust and personal contact with wastes indicate a <br />need. <br />Employees will remove one protective suit when leaving the work area and proceed to <br />the shower before changing into street clothes. <br />Water for drinking and washing will be provided at the work site. If remote toilets are <br />used, personnel will be required to shower before proceeding out of the area. Toilets <br />placed adjacent to the work area will be cleaned daily of potentially asbestos -containing <br />wastes. <br />