Laserfiche WebLink
✓w �V cwi HVir VU•co n1 *VUU tH8 NU. UUUUUV P. 07 <br /> Operation <br /> Any water/product directed into the OWS is automatically separated and <br /> pumped to either the black poly tank or SN-6. <br /> When the wastewater tank is approximately three fourths full, bring it <br /> to my attention so it can be tested by a lab or local field test. When <br /> it is determined that wastewater meets city standard of less than 100 <br /> ppm I will give the clearance to open the valve to the sewer system. <br /> This is a gravity flow system that is quite slow. <br /> In this manual will be kept a checklist for the wastewater system. This <br /> checklist will be filled out weekly on Sunday. The only item not filled <br /> out on Sunday will be the last finish meter reading, which will be read <br /> on the EOM. This reading will also be used for the first start reading <br /> on the new month. <br /> initials: <br /> SEG pp m jo <br /> LWH <br /> M 0 2- <br /> FJO — <br /> <— <br /> MRF <br /> EVP <br />