Laserfiche WebLink
Report of Remedial and Soil•ling Activities Conducted in Response to tkansmix Pump Back- ' <br /> Pressure Valve Release at the SFPP Stockton Terminal, Stockton, California ' <br /> September 15,2006 <br /> removal will not be performed. Given an understanding that in the future the RWQCB may require ' <br /> additional actions„ SFPP requests authorization for backfill and compaction with a low permeability <br /> material. Closure of the excavation is required to reduce site safety hazards, eliminate the potential , <br /> for rain water pooling, and to allow access to operational equipment. <br /> If you have any questions regarding this report or wish to discuss other issues concerning the site, <br /> please contact me at(714)560-4875. ' <br /> Sincerely, <br /> Michael Pitta ' <br /> Remediation Project Manager <br /> 1 <br /> 1 <br /> t <br /> 1 <br />