Laserfiche WebLink
J. H. KLEINFELDER & ASSOCIATES <br /> 2 BACKGROUND <br /> Time Oil Company has demolished two above ground storage tanks and intends <br /> to construct one 80 foot diameter tank in their place. The planned <br /> foundation pad extends to a depth of four feet below existing grade under <br /> the entire proposed tank. Proposed excavation should remove soil to a <br /> depth of four beneath the entire area of the tank. San Joaquin County <br /> Environmental Health offices have requested a work plan be prepared to <br /> sample the soil to be excavated for petroleum hydrocarbons. The scope of <br /> work follows. <br /> 27:712-2 2 <br />