My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 11:07:05 PM
Creation date
11/1/2018 2:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE ESTIMATING SHEET <br /> PROJECT: DGS-RESD Siebold Construction <br /> TASK 4: Coordination of Soil and Purge Water Disposal (3 Events) <br /> ect the <br /> hellmonitoring ain total. estructionactivpitestq�ofconduct <br /> aiu acceptance for the disposal of wastes generated during <br /> disposal events in total. quarterly monitoring and sampling events for one year 3 <br /> ITEM RATE <br /> GND LABOR UNIT QUANTITY MARKUP TOTAL <br /> Principal Geologist #EVENTS TOTAL <br /> Senior/Project Manager $165.00 HOUR <br /> Associate/Project Consultant $139.00 1 NA <br /> HOUR i 3 $495.00 <br /> Sr Staff Consultant $119.00 HOURHOUR NA 3 <br /> Junior ConsultanUSenior Technician $99'00 2 NA $417.00 <br /> Junior technician $9200 HOUR 2 NA 3 $71400 <br /> 3 <br /> Drafting $79.00 HOUR NA 3 $59400 <br /> Technical Report Reviewer $73.00 HOUR 3 NA $0.00 <br /> $0.00 <br /> ClencalfWord Processing $73.00 HOUR NA 3 <br /> SUBTOTAL EMPLOYEE LA BOR $59.00 NA $0.00 <br /> HOUR 1 3 $0.00 <br /> EXPENSES NA 3 <br /> $177.00 <br /> Subcontractors $2,397.00 <br /> Utility Clearance <br /> Concrete Corer TASK 1 <br /> Traffic Control TASK $0.00 <br /> 1 1 $0.00 <br /> $0.00 <br /> Laboratory(See Attached Breakdown) TASK 1 1 $0.00 <br /> Driller $614.00 TASK <br /> 1 $81.40 $0.00 <br /> Equipment Rental TASK 1 1 $695.40 <br /> TASK $0.00 1 $0,00 <br /> e <br /> sBLandfill Fees <br /> Permits <br /> 1 $0.00 <br /> Permits $3,500.00 TASK 1 1 1 $0.00 <br /> 00 $3,850.00 <br /> WeWa <br /> Permits$312*$66 ea atlditio <br /> Dischargerge 1 $350. <br /> Permit TASK 1 <br /> TASK $0.00 1 $0.00 <br /> Encroachment Permit 1 $0.00 1 <br /> Equipment Costs TASK 1 $0.00 <br /> $0.00 1 <br /> Misc Small Items $0.00$33.00 DAY Tyvek/Polyethylene Suds $8.00 IT 1 NA 3 $99.00 <br /> Gloves-Nitrile,Lined,Heavywei ht NA <br /> Glp 9 $2.59 PAIR 1 $0.00 <br /> oves- <br /> Nitrile,Disposable.Unlined $0.50 PAIR NA 1 $0.00 <br /> Organic Vapor Cartridge R51A $10 OB PgIR NA1 $0.00 <br /> 2'Disposable Bailer with drain tube $11.00 EACH NA 1 $0.00 <br /> Purge?amp 2"submersiole $59.00 DAY NA1 $0.00 <br /> Pressurizetl Bailer with Fiher $25.00 EACH NA1 $0.00 <br /> Encore Sample Set(includes 3-(5)gm.Samplers) $30.00 EACH NA 1 $0.00 <br /> Sa'Tubes(stainless steep $13.00 EACH NA 1 $0.00 <br /> Hanc Auger with Spld Spoop and Hammer $33.00 DAY NA 1 $0.00 <br /> 55-gal Drum $53A0 EACH NA1 $0.00 <br /> T Weighted Surge Blocs $5.00 EACH NA 1 $0.00 <br /> Looking Well Caps-2' $2600 EACH NA 1 $0.00 <br /> NA <br /> Padlock $1300 EACH 1 $0.00 <br /> Water Level/Interface ^o cetor Probes $53.00 DAY NA 1 $0.00 <br /> Photovac TIP Photo.a-Detector $100.00 DAV NA 1 $0.00 <br /> Dissolved Oxygen CR=Vulti-Meter $53.00 DAV NA 1 $0.00 <br /> Field Nitrate/Phosc-are Tests $2.00 EACH NA 1 $0.00 <br /> $33.00 DAY NA 1 $0.00 <br /> Air Sampling Pump NA 1 $0.00 <br /> $53.00 DAV <br /> pH/Cona/I emp Meter $53.00 DAY NA <br /> I urbidity MeterNA 1 $0.00 <br /> $26.00 DAY NA <br /> Pipe Finder(metal detector) $20.00 DAV <br /> tape/chain) $46.00 DAY NA 1 $0.00 <br /> Traffic Control Barricades NA 1 $0.00 <br /> $7.00 EACH <br /> Mileage NA 1 $0.00 <br /> $0.565 MILE 160 NA 3 $271.20 <br /> SUBTOTAL EXPENSES <br /> TASK#4 GRAND TOTAL <br /> $7,512.6D <br /> 2015-2016 Siebold sIsc <br /> 2/202014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.