Laserfiche WebLink
FEE ESTIMATING SHEET <br /> PROJECT: DGS-RESD: Siebold Construction <br /> ALT 1: Conduct a 60-day HVDPE Pilot Test and Report <br /> GHD will prepare a <br /> lacment)will be <br /> royal.Conduct a Pilot Test using HVDPE based on the observed petroleum <br /> If the site soil and groundwater data indicate unacceptable residual petroleum hydrocarbon concentrations, <br /> workplan and submit to the CVRW<9CB for app pilot test event at the site.The <br /> it The proposed monitoring/remediation well(M - rep <br /> concentrations in MW-2 and west of the former UST pit, <br /> hose extraction(HVDPE)p <br /> performed in two nti day HVDPE events(60 days total)if preliminary data indicates.Concentration trends and <br /> included in the Pilot Testing.GHD anticipates conducting a 60 day,dual-p <br /> Pilot Test may be p ro ected mass removal rates,review <br /> mass removal rates will be monitored.The Pilot Test event will at evaluated to estimate long-term results for this option.other <br /> wells prior to the test, a[the <br /> recommendations.Assume 60 da s of extraction and 60,000 gallons of water to <br /> parameters will be assessed such as extraction well Dow rate that can be sustained,p <br /> dissolved concentration trends, and prepare TOTAL TOTAL <br /> contain,treat,and discharge by CalClean.groundwater samples will be collected from the monitoring <br /> ITEM <br /> RATE UNIT QUANTITY MARKUP #EVENTS <br /> NA 1 $990.00 <br /> $16500 HOUR 6 1 $1,668.00 <br /> GHDILABOR. 12 NA $4,780.00 <br /> Principal ueatOgiSt $139.00 HOUR NA 1 <br /> 40 1 $14,652.00 <br /> Be or/ Manager $119.00 HOUR 148 NA $0.00 <br /> Associate/Pro ect Consultant $a-.-- HOUR NA 1 <br /> Sr.Stag Consultant $9P.-- HOUR NA 1 $0.00 <br /> Junior ConsultanUSenior Technician $79,00 HOUR NA 1 $438.00 <br /> Junior Technician $73.00 HOUR 6 1 $584.00 <br /> NA <br /> e <br /> Drafting $73.00 HOUR NA 1 $472.00 <br /> Technical Report Reviewer $59.00 HOUR 8 $23,664.00 <br /> Clencal/WOfd Processing 228 <br /> SUBTOTAL EMPLOYEE LABOR <br /> EXPENSES $0.00 1 $0.00 <br /> Subcontractors TASK 1 $0.00 <br /> TASK 1 $0.00 1 $0.00 <br /> Utility Clearance $0 00 1 <br /> Concrete Carer TASK 1 $15,681.60 <br /> Traffic Control 1 $1.425.60 1 <br /> $14,256.00 TASK 1 $4,200.00 2 $92,400.00 <br /> Laboratory(See Attached Breakdown) 00.00 TASK 0000 $900.00 2 $1g,800.00 <br /> Cal Clean Inc.Mobile HVDPE Contractor(60-day $9,000 00 TASK 1 $0.00 <br /> Water Treatment/Discharge TASK 1 $0.00 1 <br /> DisposallLandfill Fees $0.00 <br /> Permits TASK 1 $0.00 1 <br /> WeIIIBonng Permits$312+$66 ea addNonal1 $109.90 1 $1,100.00 <br /> Disarge Permit <br /> $1,00000 TASK 1 $0.00 <br /> chTASK 1 <br /> Encroachment Permit <br /> Equipment Costs $33.00 DAY 1 NA 15 $495.00 <br /> Misc.Small Items $6.00 SUIT NA 1 $0.00 <br /> Ty polyethylene Suits $2 59 PAIR NA 1 $0.00 <br /> Gloves-Nitrile,Lined,Heavyweight $0.50 PAIR NA 1 $0.00 <br /> Gloves-Nitrile,Disposable,Unlined $1000 PAIR NA 1 $0.00 <br /> Organic vapor Cartridge R51A $11.00 EACH NA 1 $0.00 <br /> 2'Dis usable Bailer with drain tube $59.00 DAY NA 1 $0.00 <br /> Purge Pump 2'submersible $25.00 EACH NA 1 $0.00 <br /> Pressured Bailer with Filter $30.00 EACH NA 1 $0.00 <br /> Encore Sample Set(includes 3-(5)gm.Samplers) $1300 EACH NA 1 $0.00 <br /> . <br /> Soil Tubes(stainless steel) $3100 DAY NA 1 $0.00 <br /> Hand Auger with Split Spoon and Hammer $5300 EACH NA 1 $0.00 <br /> 55-gal Drum NA 1 $0.00 <br /> 2'Weighted Surge Block $5.00 EACH <br /> $26.00 EACH NA 1 $0.00 <br /> Ladling Well Caps-2' $13.00 EACH NA <br /> Padlock NA t $0.00 <br /> Water Level/Interface Indicator Probes $53.00 DAY <br /> DAY NA 1 $0.00 <br /> Photovac TIP Photo-Ion Detector $100.00 NA 1 $0.00 <br /> Dissolved Oxygen l ORP Multi-Meter $53.00 DAY NA <br /> Field Nitra[elPhosphate Tests $2.00 EACH <br /> $33.00 DAY NA <br /> Sensidyne Pump and Tubes $53.00 DAY NA <br /> Air Sampling Pump $53.00 DAY NA 1 $0 00 <br /> pH/Condrremp Meter NA <br /> Turbidity Meter $26.00 DAY <br /> 00 DAY NA 1 <br /> Pipe Finder(metal detector) $20. NA 1 $0.00 <br /> tapelchain) $46.00 DAY <br /> Traffic Control Barnmaes $7.00 EACH NA 1 $0.00 <br /> $0.565 MILE 160 NA 18 $1,627.20 <br /> Mileage 5131,103.80 <br /> SUBTOTAL EXPENSES $154,667.80 <br /> TASK 4 <br /> 5 GRAND TOTAL <br /> 201 <br />