Laserfiche WebLink
• <br /> FEE ESTIMATING SHEET <br /> PROJECT: DGS-RESD: Siebold Construction <br /> ALT 2: Quarterly Monitoring, Sampling, and Reporting (4 <br /> Quarters <br /> If necessary to complete site closure, 1 additional year of monitoring after the 01 day HVDPE event to monitor the <br /> dissolved hydrocarbon trends. Collect the required representative samples to profile and gain acceptance for the <br /> disposal of wastes generated during the monitoring and well destruction activities. <br /> ITEM RATE UNIT QUANTITY MARKUP TOTAL <br /> GHo LABOR #EVENTS TOTAL <br /> Principal Geologist $165.00 HOUR <br /> Senior/Project Manager $139.00 HOUR 1 NA 4 $660.00 <br /> Associate/Project Consultant 8 NA 4 $4,446.00 <br /> Sr.Staff Consultant $119.00 HOUR g NA 4 <br /> $99.00 HOUR $3,808.00 <br /> Junior Consultant/Senior Technician 24 NA 4 $9,504.00 <br /> Junior Technician $92.00 HOUR NA 4 <br /> Drafting $79.00 HOUR 4 $0.00 <br /> NA <br /> g $73.00 HOUR 3 $0.00 <br /> Technical Report Reviewer NA 4 $876.00 <br /> Clencal/Word Processing $73.00 HOUR 4 NA 4 $1,168.00 <br /> $59.00 HOUR 6 NA 4 <br /> SUBTOTAL EMPLOYEE LABOR 54 $1,416.00 <br /> EXPENSES $21,880.00 <br /> Subcontractors <br /> Utility Clearance TASK <br /> Concrete Corer 1 $0.00 1 $0.00 <br /> ConfluenceTASK 1 $0.00 1 <br /> $1,200.00 TASK $0.00 <br /> Laboratory(See Attached Breakdown 1 $120'00 4 $5,280.00 <br /> $2,303.40 TASK 1 $230.34 <br /> Water Storage Tank 4 $10,134. <br /> TASK96 <br /> Equipment Rental 1 $0.00 1 $0.00 <br /> TASK 1 $ODO 1 $0.00 <br /> Disposal/Lantlfill Fees $600.00 TASK 1 <br /> Permits $60.00 2 $1,320.00 <br /> Well/aoring Permits <br /> Discharge Permit TASK 1 $0.00 1 <br /> Encroachment Permit $0.00 <br /> TASK 1 $0.00 1 $0.00 <br /> TASK 1 <br /> Equipment Costs $0.00 1 $0.00 <br /> Misc Small Items $33.00 DAY 1 <br /> Tyvek/Polyethylene Suits NA 4 $132.00 <br /> $8 <br /> Gloves-Nitrile .00 SUIT NA 1 $0.00 <br /> , Lined, Heavyweight $2.59 PAIR <br /> Gloves-Nitrile,Disposable, Unlined NA 1 $0.00 <br /> .50 PAIR NA 1 $0.00 <br /> $0 <br /> Organic Vapor Cartridge R51A $10.08 PAIR <br /> 2"Disposable Bailer with drain tube NA 1 $0.00 <br /> $11.00 EACH NA 1 $0.00 <br /> Purge Pump 2"submersible $59.00 DAY <br /> Pressurized Bailer with Filter NA <br /> $25.00 EACH NA 1 $0.00 <br /> Encore Sample Set(includes 3-(5)gm.Samplers $30.00 EACH <br /> Soil Tubes(stainless steel) NA 1 $0.00 <br /> $13.00 EACH NA 1 $0.00 <br /> Hand Auger with SPR Spoon and Hammer $33.00 DAY <br /> NA 1 $0.00 <br /> 55-gal Drum <br /> $53.00 EACH NA 1 $0.00 <br /> 2"Weighted Surge Block $5.00 EACH <br /> Locking Well Caps-2" $26.00 EACH NA 1 $0.00 <br /> Patllock NA 1 $0.00 <br /> $13.00 EACH NA 1 $0.00 <br /> Water Levelllntertace Indicator Probes $53.00 DAY 1 <br /> Photovac TIP Photo-Ion DeteIXor NA 4 $21200 <br /> $100.00 DAY NA 1 $0.00 <br /> Dissolved Oxygen/ORP Multi-Meter $53.00 DAY <br /> Fieltl Nitra[e/Phosphate Tests NA <br /> $2.00 EACH NA <br /> Sensitlyne Pump and Tubes $33.00 DAY <br /> Air Sampling Pump $53.00 DAY NA 1 $0.00 <br /> pH/Condlremp Meter $53.00 DAY NA 1 $0.00 <br /> Turbidity Meter $26.00 DAY NA 1 $0.00 <br /> Pipe Finder(metal detector) NA 1 $0.00 <br /> tape/chain) $20.00 DAY NA 1 $0.00 <br /> NA 1 $0.00 <br /> Traffic Control Barricades $$46.00 7.00 - EDAY ACH1. <br /> Mileage NA 1 $0.00 <br /> $0.565 MILE 160 NA 4 $361.60 <br /> SUBTOTAL EXPENSES <br /> TASK#6 GRAND TOTAL= $17,440.56 <br /> $39,320.56 <br /> 2015-2016 Sieboldxlsx <br /> 2/20/2014 <br />