EAR R09 — 121 • <br /> Siebold Construction 2 • <br /> April 4, 2014 <br /> Pre-approval <br /> COST PRE-APPROVAL BREAKDOWN <br /> # <br /> Task* Amount Pre- <br /> A roved Comments <br /> 1 Low Risk <br /> Closure $4,023 Low risk closure evaluation and reporting. <br /> 2 Public Public notification process for properties not more <br /> Notification $2,388 than 300 feet from the boundaries of the site. <br /> 3 <br /> Well Destroy 6 wells (60 ft. deep), work plan, <br /> Destruction $25,000 permitting, and reporting. Amount requested <br /> ($41,124) is excessive and unreasonable for the <br /> scope of work. Only $25,000 is approved. <br /> 4 Waste <br /> Disposal $7,513 Waste disposal from 2 GWM events and well <br /> destruction. <br /> $154,668 has been requested for conducting 60 <br /> 5 60 Day day HVDPE pilot test. Based on the recent GWM <br /> HVDPE $0 data, it seems that site may qualify for the low risk <br /> closure and the 60 day HVDPE event may not be <br /> required. <br /> Requested $39,321 for conducting 4 GWM events <br /> (3 to 4 MWs) and reporting. Amount requested is <br /> GWM excessive and unreasonable. As indicated above, <br /> 6 Events $10,000 this site may qualify for the low risk closure. <br /> Amount for 2 GWM events is approved ($10,000). <br /> As indicated in pre-approval request, amount for <br /> GWM will be used only if needed depending on <br /> the low risk closure evaluation. <br /> TOTAL <br /> PRE- $48,924 <br /> APPROVED <br /> Task descriptions are the same as those identified in GDH estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The <br /> Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. <br /> • The work products must be acceptable to the Central Valley Regional Water Quality <br /> Control Board (Regional Board). <br /> • If a different scope of work becomes necessary, then you must request pre-approval <br /> Of costs on the new scope of work. <br /> • Although I have referred to the GDH proposal in my pre-approval above, please be <br /> aware that you will be entering into a private contract: the State of California cannot <br /> compel you to sign any specific contract. This letter pre-approves the costs as <br />