Laserfiche WebLink
EAR R09— 121 • • <br /> Siebold Construction 3 <br /> April 4, 2014 <br /> Presented in theposal ro Pre-approval <br /> p dated October 26, 2012 by GDM for conducting the work <br /> approved by the Regional Board. <br /> Please remember that it is still necessary to submit the actual costs of the work as <br /> explained in the Reimbursement Re uest Instructions <br /> consistent with this pre-approval before to confirm that the costs are <br /> YOU will be reimbursed. <br /> Your consultant prepares their invoices to incPlease insure that <br /> lude the required breakdown of <br /> costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes <br /> made in the scope of work or increases in the costs, <br /> submitted you must include copies of all: When the invoices are <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from Regional Board. <br /> Please call if you have any questions; 1 can be reached at (916) 341-5787. <br /> Sincerely, <br /> Jatin Khandwala <br /> Water Resource Control Engineer <br /> Technical Review Unit I <br /> Underground Storage Tank Cleanup Fund <br /> cc: James Barton <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, Suite # 200 <br /> Rancho Cordova, CA 95670 <br /> David Vossler <br /> GDH Inc. <br /> 2235 Mercury Way, Suite 150 <br /> Santa Rosa, CA 95407 <br />