My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 11:07:05 PM
Creation date
11/1/2018 2:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • ' ' a <br /> ------------ <br /> COST ESTIMATE <br /> GHD will begin the proposed work after receipt of a Contract Amendment with the State of California <br /> DGS-RESD authorizing the proposed work. GHD will prepare the necessary permits and will request the <br /> CVRWQCB to obtain the property owner signatures. Although we do not anticipate problems accessing the <br /> property, if any problems do arise during this scope of work, additional effort will be invoiced on a time-and- <br /> materials basis according to our contracted fee schedule. <br /> Estimated costs listed on the attached spreadsheet for the described scope of work conform to the approved <br /> State of California Cost Guidelines published by the State Water Resources Control Board's Underground <br /> Storage Tank Cleanup Fund (USTCF). This work will be performed on a time-and-materials basis, in <br /> accordance with the USTCF-approved labor billing rates at the time services are performed and conforming to <br /> the terms of the original contract for environmental services for this site. <br /> This scope and budget has been reviewed and approved by Mr. James Barton of the CVRWQCB. GHD has <br /> prepared this cost to closure that includes two alternative scopes of work(Alternative 1 —60-Day HVDPE Pilot <br /> Test and Reporting and Alternative 2—Quarterly Groundwater Monitoring, Sampling, and Reporting, 4 <br /> Quarters) if required to obtain case closure. The estimated cost to closure is for the amount of$249,137. <br /> If you have any questions, please contact me at your convenience at (707) 523-1010. <br /> Sincerely, <br /> GHD INC. <br /> avid J.Vossle� <br /> Project Manager <br /> sc <br /> Attachment Cost Estimating Spreadsheets <br /> 03009-10017 Siebold Construction 4 of 4 February 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.