My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 11:07:05 PM
Creation date
11/1/2018 2:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> `w Attachment B <br /> SUMMARY <br /> COST ESTIMATING SHEET (UST FUND RATES) <br /> PROJECT NAME: DGS-RESD: Siebold Construction <br /> Project Phase Description: Subsurface Investigation <br /> PROJECT NUMBER: 03009-10017 PROJECT MANAGER: David Vossler <br /> Prepared by: Ryan Crawford Reviewed By: <br /> Date: February 20, 2014 Review Date: <br /> TASK/UNIT GHD Labor EXPENSES =TOTAL=COST • <br /> 1) Evaluation of Site for Low Risk Closure <br /> $4,023 $0 $4,023 <br /> 2) Public Notification -One Fact Sheet(including posting at the site) <br /> $2,388 $102 $2,490 <br /> 3) Well Destructions (6 wells to 60') -Workplan, Permiting, USA Markup, Well <br /> Destruction and Report $11,868 $29,256 $41,124 <br /> 4) Coordination of Soil and Purge Water Disposal (3 Events) <br /> $2,397 $5,116 $7,513 <br /> ALT 1 Conduct a 60-day HVDPE Pilot Test and Report <br /> AL 1-2 Quarterly Monitoring, Sampling, and Reporting (4 Quarters) $23.5641 $131,104 $154,668 <br /> $21,880 $17,441 $39,321 <br /> $66,120 $183,017 $249,137 <br /> "`Please note that these cost estimates are estimates only, and the actual cost may vary depending on field conditions at the time the work is completed. <br /> • <br /> 2015-2016 S,eboldAM <br /> ?20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.