Laserfiche WebLink
A <br /> `w Attachment B <br /> SUMMARY <br /> COST ESTIMATING SHEET (UST FUND RATES) <br /> PROJECT NAME: DGS-RESD: Siebold Construction <br /> Project Phase Description: Subsurface Investigation <br /> PROJECT NUMBER: 03009-10017 PROJECT MANAGER: David Vossler <br /> Prepared by: Ryan Crawford Reviewed By: <br /> Date: February 20, 2014 Review Date: <br /> TASK/UNIT GHD Labor EXPENSES =TOTAL=COST • <br /> 1) Evaluation of Site for Low Risk Closure <br /> $4,023 $0 $4,023 <br /> 2) Public Notification -One Fact Sheet(including posting at the site) <br /> $2,388 $102 $2,490 <br /> 3) Well Destructions (6 wells to 60') -Workplan, Permiting, USA Markup, Well <br /> Destruction and Report $11,868 $29,256 $41,124 <br /> 4) Coordination of Soil and Purge Water Disposal (3 Events) <br /> $2,397 $5,116 $7,513 <br /> ALT 1 Conduct a 60-day HVDPE Pilot Test and Report <br /> AL 1-2 Quarterly Monitoring, Sampling, and Reporting (4 Quarters) $23.5641 $131,104 $154,668 <br /> $21,880 $17,441 $39,321 <br /> $66,120 $183,017 $249,137 <br /> "`Please note that these cost estimates are estimates only, and the actual cost may vary depending on field conditions at the time the work is completed. <br /> • <br /> 2015-2016 S,eboldAM <br /> ?20/2014 <br />