My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
820
>
2900 - Site Mitigation Program
>
PR0536718
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 11:07:05 PM
Creation date
11/1/2018 2:50:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536718
PE
2960
FACILITY_ID
FA0021094
FACILITY_NAME
FORMER SIEBOLD CONSTRUCTION
STREET_NUMBER
820
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14729211
CURRENT_STATUS
01
SITE_LOCATION
820 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE ESTIMATING SHEET <br /> PROJECT: DGS-RESD: Siebold Construction <br /> TASK 1: Evaluation of Site for Low Risk Closure <br /> This Task will involve the review of site data and its'application to the SWRCB's LTCP criteria for low-risk closure.Discuss the <br /> findings with the CVRWQCB.If closure is warranted,prepare a Site Closure Request. <br /> ITEM RATE UNIT QUANTITY MARKUP TOTAL TOTAL <br /> #EVENTS <br /> GHD.LABOR' <br /> Principal Geologist $165.00 HOUR 2 NA 1 $330.00 <br /> Senior/Project Manager $139.00 HOUR 4 NA 1 $558.00 <br /> Associate/Project Consultant $119.00 HOUR 8 NA 1 $952.00 <br /> Sr.Staff Consultant $99.00 HOUR 16 NA 1 $1,584.00 <br /> Junior Consultant/Senior Technician $92.00 HOUR NA 1 $0.00 <br /> Junior Technician $79.00 HOUR NA 1 $0.00 <br /> Drafting $73.00 HOUR 2 NA 1 $14800 <br /> Technical Report Reviewer $73.00 HOUR 3 NA 1 $219.00 <br /> Clerical/Word Processing $59.00 HOUR 4 NA 1 $236.00 <br /> SUBTOTAL EMPLOYEE LABOR 39 $4,023.00 <br /> EXPENSES <br /> Subcontractors <br /> Utility Clearance 1TASK 1 $0.00 1 $0.00 <br /> Concrete Corer I TASK 1 $0.00 1 $0.00 <br /> Traffic Control <br /> TASK 1 $0.00 1 $0.00 <br /> Laboratory(See Attached Breakdown TASK 1 $0.00 1 $0.00 <br /> Cal Clean Inc.Mobile HVDPE Contractor(30-days TASK 1 $0.00 1 $0.00 <br /> Water Treatment/Discharge- TASK 1 $0.00 1 $0.00 <br /> Disposal/Landfill Fees TASK 1 $0.00 1 $0.00 <br /> Permits <br /> Well/Bonn Permits$312+$66 as additional TASK 1 $0.00 1 $0.00 <br /> Discharge Permit TASK 1 $0.00 1 $0.00 <br /> Encroachment Permit TASK 1 $0,001 1 $0.00 <br /> Equipment Costs <br /> Misc.Small Items $33.00 DAY NA 1 $0.00 <br /> Tyvek/Polyethylene Suits $8.00 SUIT NA 1 $0.00 <br /> Gloves-Nitrile,Lined,Heavyweight $2.59 PAIR NA 1 $0.00 <br /> Gloves-Nitrile,Disposable,Unlined $0.50 PAIR NA 1 $0.00 <br /> Organic Vapor Cartridge R51A $10.08 PAIR NA 1 $0.00 <br /> 2"Disposable Bailer with drain tube $11.00 EACH NA 1 $0.00 <br /> Purge Pump 2"submersible $59.00 DAY NA 1 $0.00 <br /> Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 <br /> Encore Sample Set includes 3-(5)gm.Samplers) $30.00 EACH NA 1 $0.00 <br /> Soil Tubes(stainless steep $13.00 EACH NA 1 $0.00 <br /> Hand Auger with Split Spoon and Hammer $33.00 DAY NA 1 $0.00 <br /> 55-gal Drum $53.00 EACH NA 1 $0.00 <br /> 2"Weighted Surge Block $5.00 EACH NA 1 $0.00 <br /> Locking Well Caps-2" $26.00 EACH NA 1 $0.00 <br /> Padlock $13.00 EACH NA I 1 $0.00 <br /> Water Level/Interface Indicator Probes $53.00 DAY NA 1 1 $0.00 <br /> Photovac TIP Photo-Ion Detector $100.00 DAY NA 1 $0.00 <br /> Dissolved Oxygen/ORP Multi-Meter $53.00 DAY NA 1 $0.00 <br /> Field Nitrate/Phosphate Tests $2.00 EACH NA 7 $0.00 <br /> Sensidyne Pump and Tubes $3300 DAY NA 1 $0.00 <br /> Air Sampling Pump $53.00 DAY NA 1 $0.00 <br /> pH/Cond/Temp Meter $53.00 DAY NA 1 $0.00 <br /> Turbidity Meter $26.00 DAY NA 1 $0.00 <br /> Pipe Finder(metal detector) $20.00 DAY NA 1 $0.00 <br /> tape/chain) $46.00 DAY NA 1 $0.00 <br /> Traffic Control Barricades $7.00 EACH NA 1 $0.00 <br /> Mileage $0.565 MILE NA 1 $0.00 <br /> SUBTOTAL EXPENSES $0.00 <br /> TASK#1 GRAND TOTAL= $4,023.00 <br /> 2015-2016 Smbold.zlsx 2/20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.