My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. UNDER -DISPENSER C ONTAINMF.NT aMCI TFCTlVf-- <br />Page => _ of F <br />ethod Developed By: ❑ UDC Manufacturer 0 Industry Standard v X Professional Engineer -� <br />❑ Other (Spec) <br />F___ <br />ethod Used: ❑ Pressure D Vacuum X Hydrostatic <br />D Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />UDC # 1&2 <br />UDC # 3&4 <br />UDC # 5&6 <br />UDC # 7&8 <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />32" <br />32" <br />32" <br />32" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />9" <br />10" <br />11" <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5" <br />5" <br />6" <br />6" <br />Condition of UDC prior to <br />-testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Line i l" <br />Water Line 12" <br />Water Line 13" <br />Water Line 12 %" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />roduct and water)?* <br />X Yes No ❑ NA <br />X Yes No DNA <br />X Yes No ❑ NA <br />-- <br />X Yes No ❑ NA <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?" <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑Yes X No ❑ NA <br />❑Yes X No ❑ NA <br />❑Yes X No ❑ NA <br />❑Yes X No [INA <br />Wait time between applying <br />water and starting test <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />10:55 <br />11:00 <br />11:35 <br />11:40 <br />Initial Reading (Rj): <br />.001 <br />.001 <br />.001 <br />.001 <br />'fest End Time: <br />11:25 <br />11:30 <br />12:05 <br />12:10 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes D No ❑ NA <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Penetrations enter from Bottom of Bravo System UDC'S. <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a= of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.