My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 14 10 08: a-A 1 P CC o"Kta ctars 1209461c-42 <br />4t'i L V, <br />JAN 14 2010 <br />__114f'SYSTEM RETROFIT OR REPAIR <br />J4_04 tygidk ft-x—]Mbf 3 sets of plans'&' applications as originals will be retained by EHD) <br />TMENT <br />l4EALTF I BEP.Atl <br />1 • Site map enclosed? YES[) NO <br />2. Oubmit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person .installing or testing any component that is repaired or replaced. Ensure a copy of the 'Site Health and Safety <br />Plan" is available on the jobsite as required by Title B. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and. attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade,-: use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />jj,, L" <br />T <br />V <br />u <br />_n <br />A/_o 0 <br />(jer4U -H_ <br />V <br />4. List of-eqVipment to be used (Attach n Lifacturer s <br />specification sheets showing third-party approval): <br />017h 1 /.,K I.A YV. A �Mj P A 9A A A� <br />A MjL & ?,a5 0/ <br />t i Uzo og <br />Cz <br />7 <br />% <br />n <br />2- <br />A S <br />G <br />
The URL can be used to link to this page
Your browser does not support the video tag.